My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-03-26-minutes-public-works-study-session
>
Meetings
>
2018
>
04. April
>
2018-04-03 10:00 AM - Commissioners' Agenda
>
2018-03-26-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 2:01:49 PM
Creation date
5/12/2020 1:57:14 PM
Metadata
Fields
Template:
Meeting
Date
4/3/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
43585
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Eastern Washington Phase HMunicipal Stormwater Permit <br />VI. Status Report Covering Calendar Year <br />Permittees are required to submit annual reports online or in a format provided by Ecology, <br />pursuant to permit condition S9.A. <br />1. YES ❑ NO ❑ Attach a notification of any jurisdictional boundary changes resulting <br />NA ❑ in an increase or decrease in the Permittee's geographic area of coverage <br />during the reporting period, and implications for the SWMP. (Required <br />annually, S9.17.4) <br />Comments: <br />S6.D Stormwater Management Program <br />1. YES NO ❑ Attach a notification of any jurisdictional boundary changes resulting <br />NA ❑ in an increase or decrease in the Secondary Permittee's geographic area of <br />coverage during the reporting period. (Required annually, S9.F.4) <br />Comments: <br />S6.D.1 Public Education and Outreach <br />2. YES ❑ NO Labeled all storm drain inlets owned or operated by the Secondary <br />Permittee that are located in maintenance yards, in parking lots, along <br />sidewalks, and at pedestrian access points. (Required no later than four <br />years from initial date of permit coverage, S6.D.l.a) <br />Comments: <br />3. YES ❑ NO ❑ Re -labeled all storm drain inlets with labels when no longer clearly visible <br />and/or easily readable within 90 days. (Required no later than four years <br />from initial date of permit coverage, S6.D.1.a) <br />Comments: <br />4. YES ❑ NO ❑ (Public ports, colleges, and universities only) Distributed educational <br />NA ❑ information to tenants and residents about the impact of stormwater <br />discharges on receiving waters and steps that can be taken to reduce <br />pollutants in stormwater runoff. (Required no later than three years from <br />initial date of permit coverage, S6.D.1.b) <br />Comments: <br />August 1, 2014 Appendix 4: Secondary Permittee Annual Report Page 1 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.