Laserfiche WebLink
Eastern Washington Phase II Municipal Stormwater Permit <br />APPENDIX 2 — Total Maximum Daily Load (TMDL) <br />Requirements <br />Additional permit requirements are based on applicable TMDLs in accordance with Special <br />Condition S7 Compliance with Total Maximum Daily Load Requirements. <br />Index <br />1. WR1A 34 South Fork Palouse River Page 1 <br />2. WRIA 39 Selah Ditch Page 5 <br />3. WRIA 39 Wilson Creek Page 6 <br />4. WRIA 54 Spokane River and Lake Spokane Page 7 <br />Appendix 2 - I "otat Maximum Daily Load {TMDL} Requirements <br />Eastern Washington Phase II Municipal Stormwater Permit - August 1, 2014 <br />Page 1 <br />