Laserfiche WebLink
8th <br />Manufacture and install swing gate @ end of 8th - going back to Posee Barns <br />All Grounds <br />Trim all trees on grounds - remove danger trees <br />Courtyard <br />Bid patio pavers project T/U Courtyard <br />RA <br />Inspect Rodeo side bathrooms and start improvements (replace toilets/sinks/paint etc) <br />GB <br />New roof on Gold Buckle <br />•L. <br />All Grounds <br />De <br />Weed spray (especially fence lines and gravel walkways - WT courtyard) <br />Painting as needed (2018 - floors yellow halls; all WT; Manastash; window caseings in yellow halls) <br />Complete Rodeo Arena Seating project (if approved) <br />RV parking <br />Complete Electrical Upgrades (if approved) <br />Complete Water Line to GB and East Pens (if approved) <br />Complete covers/roofs for doors @ Grandstands (budgeted) <br />Pull from storage & repair all rabbit, cavie & poultry cages and tables as needed <br />Prep flower boxes for planting and maintain watering! <br />Check all hoses and nozzles and repair or order new as needed (Fair needs 100' and 200' hoses) <br />Postjobs for fair workers <br />Install fans, misters and other items in barns <br />Install H2O Fountains @ identified locations (#1 b-room hall; Manastash??; other?) <br />Inspect and repair fans in barns as needed <br />Inspect and repair all irrigation as needed <br />Repair ashphalt in front of Umtanum <br />All Grounds <br />Inspect and repair all PA systems and microphones/speakers <br />Fill stalls in barns to level floors <br />GB esp <br />Deep clean grout on tiled floors <br />Complete East Pens re-configuration project <br />Plant trees around grounds <br />Scrape and paint lower boards of all barns and grandstands <br />Page 2 Event [enter Punch list for Q3 -Q3 Fair and Rodeo Prep 2018 <br />