My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-26-minutes-public-works-study-session
>
Meetings
>
2018
>
03. March
>
2018-03-06 10:00 AM - Commissioners' Agenda
>
2018-02-26-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 1:58:31 PM
Creation date
5/12/2020 1:56:04 PM
Metadata
Fields
Template:
Meeting
Date
3/6/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
42911
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kittitas County - Task Order Supplement - TO #8 <br />February 21, 2018 <br />SUPPLEMENT NO. 1 BUDGET: <br />IlRfftas CouMT CONSULTANT LINE ITEM COST ESTIMATE WORK SHEET <br />On -oil -2017 <br />Task Order s <br />Page 3 <br />CONSULTANT FEE DETERMINATION BY KPFF FOR K=AS COUNTY ON CALL <br />ROAD 6 BRIDGE PSBE <br />:STIMATION OF MANAGEMENT AND ENGINEERN4G HOURS <br />COST <br />TASK ORDER $ <br />Pnncipat I I :. <br />(Dead 1 Pmlea Mana90 ;i TadeJral Speelalw[ ! 8niv a.0- bas an Eno nae atO Tech Pm'CDnd4umr <br />IT om W litanenl i (Tom Whit w) + 154riewn4 6 [Svtly (Stnawsl 5 a.10 (B1rIlGaral A CMII ; IA, FemanOoj <br />McMdlm) <br />_ <br />S82S0 _. - $51.29 <br />._.... 588-23 <br />_ _ _ <br />542-40...._. .... <br />535.16.._ <br />_ <br />._ ... 631,40 r <br />#8.48_ -_. <br />MULTIPLIER: <br />$,6452 <br />ITEMI SCOPE OF VMK <br />I CONTRACT MANAGEMENT AND COORDINATION <br />Cw"cl CDMPllanea E Oyawsbm <br />1,8 2 <br />! <br />2 <br />5757 <br />_.. <br />lcilem COmmunlceli0ne <br />8 <br />_-- - <br />- <br />- _ - ---I <br />- - <br />- - 81,471 <br />5mtt, rks 8 Generd PAnjeel CDaedna8en <br />18 <br />4 <br />59 580 <br />lSubconaulalnl C0c1dMbw-- <br />?Irwok 0&PAaiera Summarlee <br />E1,974 <br />7 <br />$498 <br />Labor Bubteul l:, <br />_ _.9_ <br />0 -_ <br />13 <br />Sa.'70 <br />SD <br />2 SITE OR CLIENT VISIT VAeaoueMDWmOMM <br />'Tm.I(RT) <br />i 4 <br />- <br />v <br />4 <br />�. <br />d <br />67,559 <br />ipmP.I amwr Cnty <br />2 <br />4 <br />! <br />2 <br />Labor Sahwal 2: <br />a <br />I d <br />8 _ i <br />6 <br />0 <br />0 <br />52,6" <br />3 MEVELOPMENT OF PSBE- CONTRACT Bal DOCLIWNTR <br />iSheal I - Cover <br />1.0 <br />30 I <br />j t0A <br />$1,557 <br />Ishad.2 - Ran News, OusnNwa, Specs, Cws SacOen <br />_ <br />- <br />_ 4.0 <br />24 0 _ -- <br />8.0 <br />20-0 <br />$a,255 <br />:Saee13•Ge:reral Plerl.lay4u[8 F]evalion <br />j <br />6.0 <br />22.0 I <br />8.0 <br />28-0 <br />57.228 <br />__-3Shael4-Fm daODn, AbulmarL W.Wd1a 1 <br />2.0 <br />4.0 _. I20.0 <br />20.0 <br />,Shell 5- FwndaUen. AbulmeK W.W811a2 <br />•.,Shea18 <br />2.0 <br />4.0 <br />18.0 <br />18.0 <br />$4176 <br />- F-1.0 Flan and Gkdera l <br />' <br />i 5.9 <br />4.0 I <br />16.0 <br />20.0 j <br />54,587 <br />ISheel 7• Girders 2, Beark4M.10t[ _ - <br />i6Mela-ApArueeh Slan(al-. � ._._ _ <br />j__.._�______���.,� <br />-IShed9•Brgpu <br />- - - _ - <br />- 2.0 4A <br />i __1A 1 20 <br />18.0 <br />8.0 <br />�. <br />.- ._._ <br />_ lau <br />_._ -..20.0._-�- <br />- $4,178 <br />RmlAGuaMral <br />9Af��_.._-200 <br />� <br />4.0 <br />55.248'~u <br />Shwa 10- Guard RM 2$ Mmc <br />f A <br />12.04 <br />4.0 <br />18.0 <br />- <br />--;3,772 <br />(Plan end CalcWabOn Oulaigr Conp0l Checks antl Rewswa <br />BA <br />' 8.0 <br />24.0 <br />4,0 <br />I 12.8 3 <br />$6,784 <br />IPlan Coa abwlbn with CounNf my. CNd, GeDhnkall <br />[ec <br />OA <br />10A <br />2A <br />4.0 <br />92.830 <br />;Lead RaknO <br />2.0 <br />20.0 <br />---t0 <br />T <br />$2.009 <br />�plan.dmh0als. 0uerdral ra+4ew, 34ppmy TESD, drDinaBe <br />&0 <br />I <br />4D,0 I <br />40.0 <br />I 36.0 ! <br />E19A98 <br />Adddon d bmpOrary madway PWAV shed eahell, draawa7 ad <br />4A <br />at <br />9.D <br />240 <br />SA 740 <br />514ppf �puardn4 fp�erraw <br />_ _ <br />_. - <br />... <br />......5818 <br />Rmga aWrlrlde arq apacid Prp4wq[y fa 2 asaam work <br />2.0. <br />1 <br />Luber Subteeal3: <br />a t a <br />' 47 <br />221 i <br />136 <br />286 <br />1 <br />179,352 <br />4 COSTRUCTION SUPPORT • oerADx4L <br />pCD�llaSDn. RFI and SNDA ReNew. GDBB00118 <br />- - <br />Y i <br />412 <br />- _ <br />12 <br />8_ <br />1 <br />54,457 <br />54c Or CO-1yv 6 <br />,.._ <br />Labw Subtotal 4: <br />1- { 0 <br />1 <br />4 <br />' 12 <br />12_ <br />TOTAL LABOR <br />10 Sd <br />51 <br />247 <br />176 <br />272 <br />17 <br />y 13,156 <br />TOTAL REIMSllR!n <br />S 706,40 <br />MANAGEMENT RESERVE (OPTIMALI <br />S 8,000 <br />GRAND TOTAL -NOTTOEXCEEO <br />SUSS 1 53,462 <br />1 83,531 <br />6+0,215 <br />56,713 <br />S10,6W <br />5430 <br />i 95,350 <br />Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.