My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-26-minutes-public-works-study-session
>
Meetings
>
2018
>
03. March
>
2018-03-06 10:00 AM - Commissioners' Agenda
>
2018-02-26-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 1:58:31 PM
Creation date
5/12/2020 1:56:04 PM
Metadata
Fields
Template:
Meeting
Date
3/6/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
42911
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDITIONAL PERMIT TERMS AND CONDITIONS <br />FOR <br />USE OF RESERVOIR FREEBOARD AREA <br />Permit No. 38 Granted to Kittitas County. <br />Address: 205 West 5", Rm. 198, Ellensburg, WA 98925. <br />VANTAGEPARK <br />The following provisions are hereby added and made a part of Permit No. 38. <br />(1) Permittee may commence certain improvements at Vantage Park on the reservoir <br />of the Wampum development iocated,at.the site Show" <br />On old a ttimhed troom facili es he <br />facilities contemplated will include removal of <br />with the requirements of the <br />construction of new restroom facilities that comply or required, a lilt pump and <br />Americans with Disabilities Act, and, as may be necessary <br />equalization tank and associated .fresh water e yang ei��ewa� Treatmen Plant <br />facilities shall discharge waste water m <br />operated by the Kittitas County Water District No. b. <br />(2) All work and improvements shall be performed and maintained in accordance <br />with the FERC License and FERC policies applicable to Project No. 2114, now existing <br />or hereafter amended. The Kittitas County Waterwhich discharge into itsso approve the <br />treatme t and <br />design and construction of the improvements <br />collection system. <br />(3) All work shall be performed in the general location as shown in the attached <br />diagram of the proposed improvements, and specifically more than 204 feet from the <br />ordinary high water line of the Columbia River. Kittitas County shall submit <br />construction drawings and a survey depicting the location of all improvements for <br />District approval prior to the start of work under this permit. No modifications outside the <br />area indicated for construction in the drawings will be permitted thereafter without the <br />District's written consent, <br />(4) Prior to construction, Kittitas County shall comply with the requirements of the <br />Washington State Environmental Policy Act, Chapter 43.21 RCW and applicable <br />regulations and incorporate requirements suggested by resource agencies at its sole cost <br />and expense. <br />(5) Public Utility District No. 2 of Grant County agrees Haat Permit No. 38 may not <br />be revoked or cancelled during the remaining term of Public Utility District No. 2 of <br />Grant County's FERC license, which expires November 1, 2005, and will extend said <br />permit to a minimum term o ecember ubject to renewal of the FERC license <br />in favor of PUD No. 2 of Gran Jjugfun. The only exception to revocation or <br />
The URL can be used to link to this page
Your browser does not support the video tag.