My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-02-12-minutes-public-works-study-session
>
Meetings
>
2018
>
02. February
>
2018-02-20 10:00 AM - Commissioners' Agenda
>
2018-02-12-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 1:56:12 PM
Creation date
5/12/2020 1:55:43 PM
Metadata
Fields
Template:
Meeting
Date
2/20/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
42643
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ — Road# TBD Project title: Wfohl Road Improvements <br />MP ��pppTOe g 'Ob Number: RC2574-8: PROJECT LENGTH 1320a <br />SCOPIra�9 i�1'MATE $750 614 (INSTRUCTION <br />/ CREATED: 4/5/2017 By: Bryan Tapp <br />Kktitas County Is proposing to improve safety along Mehl Road by charging road profile/alignment, paving, Installing guardrail to protect hazardous slopes. <br />Safety improvements are necessary In order to reduce accidents In this segment, and also to make it easlar W plow with county equipment <br />QUANT. UNIT ITEM NO. REM UNIT PRICE gMQUNT <br />Dab <br />PROJECT CHANGE TRACKING <br />B Commenu <br />4/5/2017 <br />8T STARTEDO,Y. COST EST <br />41712017 BT UFOATED EST TO REFLECT PLAN ON CHANGES <br />4Y10/201I <br />BT ' <br />4/2512017 <br />BT ' <br />7/26/2017 <br />ST UPDATEDESTT026' ROADWAY <br />8/9/2017 <br />BT Updated eetimMe to refiM maximum road prole M 12% <br />$50,00000 <br />— <br />I � <br />fnnted 8'1412017 1010 AM Ioff <br />NUR_—.__—___ <br />1 $2,000,00- --12,000.00 <br />s1,000.Ii0 11.000.00 <br />175000.00 f75,000.00 <br />BID ITEM SUBTOTAL W/O MOBILIZATION 1515,63500 <br />SALES TAX a 8.00% $27,787.00 <br />PROJECT SUBTOTAL <br />1606,89041 <br />®�GONTNGENCIES 4% <br />124268.00 <br />CONSTRUCTION ESTIMATE <br />'9"4' <br />BELOW THE LINE COSTS <br />PRELIMINARY ENGINEERING 4% <br />$24,267.02 <br />CONSTRUCTION ENGINEERING 4% <br />124,267 02 <br />ANNUAL MAINTENANCE 10vEARS <br />$50,00000 <br />ISTS <br />AL <br />
The URL can be used to link to this page
Your browser does not support the video tag.