Laserfiche WebLink
October 27, 2017 <br />PROJECT <br />HVAC Upgrade Jail <br />TO CONTRACTOR <br />McKinstry Essention, LLC <br />5005 3'J Ave S. <br />Seattle, WA 98134 <br />Kittitas County Solid Waste Programs <br />And <br />Maintenance Project Management Office <br />925 Industrial Way, Ellensburg, WA 98926 <br />Telephone: (509) 962-7542 <br />Fax: (509) 962-7087 <br />CHANGE ORDER INTO.: 001 <br />THE CONTRACT IS CHANGED AS FOLLOWS: <br />The original Contract Sum was <br />Domestic Hot Water Heater replacement (see attached detail) <br />Replace Glycol (see attached detail) <br />The New Contract Sum including this Change Order will be <br />NOT VALID UNTIL SIGNED BY THE CONTRACTOR AND OWNER. <br />a ounty <br />Br � rgnaruny <br />Prier \iwic <br />(a-(�a-.(a� t �— <br />Dnre <br />S 1,247,495.00 <br />S 41,913.00 <br />S 5.940.00 <br />S 1 295,348.00 <br />McKinstry Essention, LLC <br />,'-4r nunu J <br />Print .Vane <br />Darr <br />