My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-12-12-minutes-solid-waste
>
Meetings
>
2018
>
01. January
>
2018-01-02 10:00 AM - Commissioners' Agenda
>
2017-12-12-minutes-solid-waste
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 1:55:51 PM
Creation date
5/12/2020 1:54:40 PM
Metadata
Fields
Template:
Meeting
Date
1/2/2018
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
41492
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r �s <br />- r <br />ly S <br />Serving the Kittircu Valley Since 1960 <br />Kittitas County Event Center <br />512 North Poplar Street <br />Ellensburg, WA 98926 <br />Attention: Jill Scheffer <br />Regarding: Re -roof the Gold Buckle Club <br />Scope of Work: <br />Date 12-2-2017 <br />Remove and haul off the existing roofing, inspect for damaged roof sheathing and leaks. Install a new 40 <br />year Pabco composition roof in a" Weather Wood, Premier Shingle " color (brown). Remove the small <br />flat curb which had be built on the front covered porch roof. Install Snow and Ice Guards on the whole <br />roof, as per the installation specifications of the product. We have included 4 sheets of plywood to <br />replace damaged ones do to moisture from leaks. Install new metal flashings, bathroom vent and <br />plumbing jacks. Prevailing wages for this scope of work are included. Re -roof permit is included. WSST <br />tax is included. <br />Total proposed bid price $ 15,094.00 <br />This proposal excludes: <br />- Additional cost of new roof sheathing and the install labor, if more than 4 are needed. <br />Schadonstruction � <br />Kelly SchadeYnan <br />SCHADEMAN CONSTRUCTION • 2680 Vantage Highway • Ellensburg, Washington 98926 <br />Phone: (509)925-5404 or (509)925-7799 • Fax: (509)925-5424 • Lic. No. SCHADCI184JB <br />
The URL can be used to link to this page
Your browser does not support the video tag.