Laserfiche WebLink
Dept. of Public Works <br />Page 2 <br />Board Direction: <br />Commissioner Jewell nominated Scott Nicolai and Karen Poulsen for District 1. <br />Commissioner O'Brien made a motion to appoint Scott Nicolai and Karen Poulsen to the <br />Flood Control Zone District Advisory Committee representing District 1 with <br />Commissioner Osiadacz seconding the motion. Motion passed with no discussion. <br />Commissioner Osiadacz made a motion to appoint Jerry Martens, Patrick G. Deneen and <br />Holly English representing District 2 to the Flood Control Zone District Advisory <br />Committee. Commissioner O'Brien seconded the motion. Motion passed with no <br />discussion. And Commissioner O'Brien made a motion to appoint Jeff Dunning and Ryan <br />Lyyski representing District 3 to the Flood Control Zone District Advisory Committee. <br />Commissioner Osiadacz seconded the motion. Motion passed with no discussion. Staff was <br />directed to present a Resolution for consideration at the next agenda session. <br />OTHER BUSINESS: <br />PROJECT UPDATES: <br />Bar 14 Road Bridee: <br />Luke updated on the Bar 14 Road project stating that staff has received all permits and work is <br />going on today, installing the bypass for the stream. Some of this work will be done in <br />collaboration with Kittitas Reclamation District (KRD). Public Works permitted work is for 200 <br />feet up and down the stream from the bridge. KRD's permitting is from their structure <br />downstream all the way up to where our 200 feet begins. Discussion was held. <br />Mercer Creek: <br />Luke reported that staff is about a week or two away from receiving the necessary permits to <br />start this project. We are working with the City of Ellensburg on this and are identifying who is <br />going to secure the equipment needed to do the project. The City of Ellensburg has volunteered <br />to complete some of the brushing that is needed since they have boom trucks and the necessary <br />staff that is familiar with this type of work. Discussion was held. <br />Teanawav Bridge Rail: <br />Luke stated that the Teanaway Bridge Rail project is completed and is now open to traffic. The <br />cost was around $115,000 and it looks like we will not get any cost recovery from the driver's <br />insurance company to reimburse for this project. <br />Luke Huck, County Engineer <br />411 N. Ruby, Ste. #1 TEL (509) 962-7523 <br />Ellensburg, WA 98926 FAX (509) 962-7663 <br />