My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-11-13-minutes-public-works-study-session
>
Meetings
>
2017
>
12. December
>
2017-12-05 10:00 AM - Commissioners' Agenda
>
2017-11-13-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 1:52:53 PM
Creation date
5/12/2020 1:52:26 PM
Metadata
Fields
Template:
Meeting
Date
12/5/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
41021
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS <br />STUDY SESSION STAFF REPORT <br />STUDY SESSION DATE: November 13, 2017 <br />TOPIC: Fairview Road Update <br />ACTION REQUESTED: None Required <br />LEAD STAFF: <br />Mark R. Cook <br />RECOMMENDATION: <br />None required — informational only. <br />BREIFING SUMMARY: <br />• Recent bridge inspection reveals significant structural damage to two bridge <br />abutments <br />• Engineer recommendation is to remove load from abutments <br />• Maintenance has completed repairs <br />• Six year plan has replacement slated for 2022 <br />BACKGROUND: <br />During a recent inspection of the three short span bridges (under 20 feet) along Fairview <br />Road; abutment damage was found at two of the three bridges. Our contract structural <br />engineer (KPFF) recommended immediate action removing loads from the structure. <br />DISCUSSION: <br />County Engineer Huck and Maintenance Manager Van De Venter met with Public Works <br />Director Cook onsite immediately following notice from KPFF. Van De Venter offered <br />structural plates as a near term solution. KPFF agreed with the added requirement to <br />"crib" the plates removing them from bearing on the broken abutments. <br />Repairs were conducted on 11/07 and 11/08/2017. Proper signage is in place and the <br />plates are expected to remain for some time. Public Works bridge inspectors will <br />monitor the repairs quarterly until such time that permanent repairs can be made. <br />The site is slated for permanent repair in 2022. Staff will begin evaluating options <br />moving the repair forward on the six year transportation plan timeline in the next several <br />weeks. <br />FISCAL IMPACTS: <br />The temporary repair is expected to cost approximately $40,000. <br />Page 1 of I <br />PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.