My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-07-24-minutes-public-works-study-session
>
Meetings
>
2017
>
11. November
>
2017-11-07 10:00 AM - Commissioners' Agenda
>
2017-07-24-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 1:51:49 PM
Creation date
5/12/2020 1:49:39 PM
Metadata
Fields
Template:
Meeting
Date
11/7/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
40471
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS <br />STUDY SESSION STAFF REPORT <br />STUDY SESSION DATE: July 24, 2017 <br />TOPIC: Lund Lane Road Improvement <br />ACTION REQUESTED: Informational — No Board Action Required <br />LEAD STAFF: <br />Marr R. Cook <br />RECOMMENDATION: <br />Informational — no Board of County Commissioner action required. <br />BREIFING SUMMARY: <br />• Big Creek PUD is required to bring Lund Lane to a public road standard <br />• The required new bridge crossing at Bureau of Reclamation irrigation canal will <br />be owned by the County <br />• Without geometric alterations, Lund Lane will likely go to 25 MPH following <br />improvement. <br />BACKGROUND: <br />Approval of the Big Creek PUD brings with it several offsite improvement requirements. <br />The existing Bureau of Reclamation (BoR) bridge must be replaced and Lund Lane be <br />improved to a public standard. The Board of County Commissioners (BoCC) is requiring <br />that the bridge be built to public standard and BoR is requiring the County to own and <br />operate the bridge over its irrigation canal. Public Works has submitted a canal crossing <br />permit and BoR is currently processing the permit application. Planning: for bridge <br />construction and road improvement are underway. <br />DISCUSSION: <br />Cooperation amongst easement owners has the potential to afford Lund Lane realignment <br />that is expected to benefit all easement owners, Preservation of irrigation controls and <br />traffic calming geometry are the likely outcome of cooperation. The developer (Deneen) <br />is expressing willingness to work with area residents. To that end, Public Works <br />proposes conducting public outreach seeking to engage easement owners on <br />improvement options for Lund Lane. Outreach is scheduled for the week of August 1, <br />2417. <br />FISCAL IMPACTS: <br />Minimal costs associated with administrative expense supporting community outreach. <br />Page 1 of 3 <br />PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.