Laserfiche WebLink
Dept. of Public Works <br />Page 4 <br />Commissioner Jewell called for a motion. Commissioner Osiadacz made a motion to <br />approve the Notice of Public Hearing to consider leasing Lot C-7 of the Kittitas County <br />Airport Binding Site Plan to Valley Fence, Inc. Commissioner Jewell seconded the motion <br />and the motion passed. <br />OTHER BUSINESS. <br />BAR 14 BRIDGE. <br />Luke stated that staff had a site visit with the structural engineer this morning and the water was <br />put back under the bridge about a week ago and filled in the side channels where we had to dig <br />around the abutments. Late last week upon inspection significant damage was found to one of <br />the girders, number eleven rebar hanging in the water and missing concrete. The structural <br />engineer found that the girder cannot maintain traffic so the bridge needs to be replaced or one <br />lane to be maintained. Luke continued that he asked the structural engineer to put together a <br />memo for the one lane option, deploy barrier, stop signs and stop bars. Staff would like to get <br />the roadway opened within the next month. Discussion was held. <br />Board Direction: <br />No direction. <br />UNIVERSITY WAY BRIDGE REPAIRS. <br />Luke spoke about the University Way Bridge and reported that staff had received final plans for <br />the project. This includes repairing the approach issues and some damage to the substructure. <br />These repairs are a part of the agreement with the City of Ellensburg that the department would <br />follow through with the repairs prior to the annexation and turn of that portion of the roadway. <br />He continued that the plans and specials were received late Friday evening. It is staff's intention <br />to try and get plans finalized, advertised and begin construction after the Kittitas County Fair and <br />Rodeo. After conversation with several contractors it was determined that a two week closure <br />would be required to complete the project. Initially, staff was rushing to get the closure <br />coordinated with the closure of Dolarway and have the closure scheduled all at once. He added <br />the Washington State Department of Transportation was not in agreement with the idea and <br />neither were their contractor on the Dolarway project. Staff is now working on finding dates for <br />the closure and will start public outreach and contact the local businesses that could be affected <br />and the current dates decided upon do coincide with the Central Washington University football <br />beginning schedule; however, it does not appear to be any home games during that time. The <br />only hindrance is that school will have started by then. Closure dates would be September 10 <br />through September 25, 2017 and that's with accelerated construction in regards to high early <br />concrete that is early curing high strength concrete that is a little more expensive but will lessen <br />the closure time by about a week. Staff is also working with BNSF Railway in regards to the <br />project. Commissioner Jewell inquired as to where the closure would start. Luke replied at <br />Reecer Creek Road to allow some room if vehicles need to get turned around but staff is still <br />411 N. Ruby, Ste. #1 TEL (509) 962-7523 <br />Ellensburg, WA 98926 FAX (509) 962-7663 <br />