My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-07-10-minutes-public-works-study-session
>
Meetings
>
2017
>
11. November
>
2017-11-07 10:00 AM - Commissioners' Agenda
>
2017-07-10-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 1:54:29 PM
Creation date
5/12/2020 1:49:38 PM
Metadata
Fields
Template:
Meeting
Date
11/7/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
40471
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PETITION TO CREATE A KITTITAS COUNTY ROAD <br />IMPROVEMFDNT DISTRICT PURSUANT TO THE PROCEDURES OF RCW 36.88.050 <br />Tentatively Designated as the <br />WIEHL ROAM IMPROVEMENT DISTRICT <br />Pursuant to the procedures as spelled out in Chapter 36.88.050 RCW Mowing signatories request that the <br />K ittitas County Commission establish a County Road Improvement Dimct known tentatively as the Wiehl <br />Road Improvement District, road district number to be assigned upon final establishmmit. <br />The proposed road district is located in Township 20 North, Range 16 East, Section 26 ofKittitas County <br />specifically for improvements associated with Wicb) Road located in or adjacent to the numerous Short Plats off <br />of public road Red Bridge. The road district boundaries would be composed of 66 individual recorded lots or <br />parcels as shown on the allwJ d district boundaries map (EXHIBIT 1). <br />The intent ofthe District is to Prepare and asphalt pave approximately 1,300 lineal feet of gravel private road <br />with the application of three tenths (0.3) of one foot of asphalt pavement with associated roadway <br />improvements, and to provide for an improved paved turn. -around at Loping Lane (EXffiBff 2) attached. The <br />County would provide annual snowplowing up to the turnaround. A preliminary cost estimate provided by the <br />Kit titas County Public Works Department for the preparation and improvement construction is $450,000. As <br />pmpos.ed the cost would be proportioned on an equal sham basis between each of the 66 lots/paroels with a <br />district payback period of ten (10) years. Estimated annual property tax assessment, including interest for the <br />ton (10) year period, is estimated at approximately $776 per lot per year. <br />Petition signatures represent, according to the records of the County Auditor, an aggregate amount of the <br />majority of the lot owners upon the improvement to be made and of the area within the limits of the assessment <br />district to be created. It is understood that property owners may add or withdraw their names froom the petition <br />at any time priorto 5:00pm of the day before ofiicW County Commission hearing and that any effected <br />Property owner will receive written notice of the hearing from the County at least f fteen (15) days bc*re the <br />hearing. <br />{� <br />Signature <br />- <br />Date <br />Page 1 of 2 <br />41se <br />Print Name <br />Parcel Number(s) <br />k <br />
The URL can be used to link to this page
Your browser does not support the video tag.