My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-07-minutes-solid-waste
>
Meetings
>
2017
>
05. May
>
2017-05-02 10:00 AM - Commissioners' Agenda
>
2017-03-07-minutes-solid-waste
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 1:47:01 PM
Creation date
5/12/2020 1:45:39 PM
Metadata
Fields
Template:
Meeting
Date
5/2/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
36349
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 4 <br />Tipping Building <br />The approximate 100- by 210 -foot transfer building will be divided into three primary functional areas: <br />(1) waste receiving, storage, and handling; (2) tire and white goods loading area; and (3) contractor <br />offices. <br />4.1 Tipping Floor Level <br />The tipping floor level will consist of a cast -in-place concrete floor surface enclosed by a separate <br />superstructure. The large tipping floor area will be covered by a pre-engineered steel rigid frame system <br />spanning the entire floor. Cast -in-place concrete push walls protecting the exterior building walls will be <br />constructed independent of the building's framing. Walls enclosing the tipping floor will be a <br />combination of metal panel walls designed to be hosed down for cleaning, and louvered openings will <br />be provided as needed for cross ventilation. Translucent panels will be used high in the wails to provide <br />a natural light source where possible: The exterior walls of the contractor office area will be a <br />combination of cast -in-place concrete and load-bearing concrete block masonry walls. <br />The tipping floor has two separate areas for unloading commercial and self -haul vehicles. <br />The commercial unloading area is designed to handle four vehicles at a time, includes areas for at least 5 <br />days of storage, and has an area for stockpiling single stream recycling material for load -out by the <br />contract operator. <br />The self -haul unloading area is designed to unload nine vehicles at a time and has an area designated <br />for stockpiling construction and demolition debris material for separate load -out. During peak times <br />(Saturdays), the commercial unloading area will be available to unload self -haul vehicles. <br />The transfer building roofing system is designed to provide a minimum of 28 feet of clearance to allow <br />unloading of all types of garbage trucks and other vehicles. The roof is designed so that rain water will <br />flow to the load -out tunnel side of the building at a slope of 2 to 12. The roof system will consist of <br />metal standing -seam panels and selected areas of skylight panels attached to the sub -framing of the <br />pre-engineered building. The metal roof panels will have a bottom surface of sheet metal to protect <br />insulation from water generated by interior hose -down activities. Perimeter gutters will provide <br />drainage from the upper roof with external downspouts discharging to underdrains at the foundation. <br />4.2 Ground Floor (Tunnel) Level <br />The ground floor level constructiori will be primarily cast -in-place concrete with portions of the exterior <br />wall surfaces exposed to view. These exposed areas will be finished using painted concrete. Doors, <br />framing, and window framing materials will match other buildings onsite using noncorroding materials <br />wherever possible. <br />The load -out tunnel will have a flat concrete floor, with a pit scale under the load -out port. The tunnel <br />may have two 15 -foot -wide by 20 -foot -high doors (one on either end). <br />See Figure 2 for the transfer building plan and Figures 3 and 4 for building elevations. <br />EN1213161143SAC DRAFT -12/23/16 4-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.