My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-02-27-minutes-public-works-study-session
>
Meetings
>
2017
>
03. March
>
2017-03-21 10:00 AM - Commissioners' Agenda
>
2017-02-27-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 1:44:17 PM
Creation date
5/12/2020 1:43:55 PM
Metadata
Fields
Template:
Meeting
Date
3/21/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
35566
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`t CASCA�F.S.., l0 }}IfCp�G <br />yA <br />KITTITAS COUNTY <br />1EKX=X1rA !; COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />Mark Cook, Director <br />STUDY SESSION MINUTES <br />February 27, 2017 <br />THOSE PRESENT: Paul Jewell, Laura Osiadacz (BOCC); Mark Cook, Luke <br />Huck, Kathy Jurgens, Candie Leader (DPW); Dan Carlson, <br />Doc Hansen, Stephanie Mifflin (CDS) <br />GUESTS: <br />None <br />FEES UPDATE: Kathy Jurgens presented spreadsheets with the updated <br />information requested by the BOCC at the last Study Session. <br />Staff reached out to other agencies for comparable fees and <br />found that the fee schedules are either outdated or do not have <br />fees implemented. Discussion was held. <br />Board Direction: BOCC requested that staff do more work on the fees <br />update. <br />NANEUM ROAD BRIDGE: Luke reported that in late November staff found damaged <br />timber caps and timber uprights along with a concrete <br />abutment footing being undermined approximately 2.5' which <br />has resulted in a vertical crack in the center of the abutment <br />extending through the footing. Luke stated that a task order <br />has been agreed upon with WSDOT that would provide the <br />repair and the purchase of the materials and all costs <br />associated with the repairs. The repairs must be completed by <br />April 151, 2017; however, the timbers that were ordered in <br />mid-December still haven't arrived and may not be delivered <br />until mid-March. Commissioner Jewell inquired if there are <br />any other options to fix the bridge if the time frame is not met. <br />Luke replied that other avenues have not been explored and <br />Mark added that only temporary fixes can be performed. <br />Luke stated that if the repairs are not completed by the <br />deadline additional consultant inspections will be necessary <br />and may require the bridge to either be reduced to one lane for <br />through traffic or closed entirely until the repairs can be <br />completed in the fall of 2017 following the commencement of <br />the irrigation season. <br />Board Direction: No Direction. <br />�—c4Lk <br />Mark Cook, Director of Public Works <br />411 N. Ruby, Suite #1 TEL (509) 962-7523 <br />Ellensburg, WA 98926 FAX (509) 962-7663 <br />
The URL can be used to link to this page
Your browser does not support the video tag.