My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-02-27-minutes-public-works-study-session
>
Meetings
>
2017
>
03. March
>
2017-03-21 10:00 AM - Commissioners' Agenda
>
2017-02-27-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 1:44:17 PM
Creation date
5/12/2020 1:43:55 PM
Metadata
Fields
Template:
Meeting
Date
3/21/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
35566
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,l1 •I• $Iat- <br />QQ �a • . . of Trana � tnfii,. <br />D ['6i r. � 011 T k_ <br />Page 1 DATE PRINTED: 12/20/2016 <br />Estimate Id: 27943 <br />—16—RG <br />DATE: <br />12/192016 <br />CODE <br />455560 <br />LOCATION OF WORK <br />Naneum road Bridge #89091 <br />DESCRIPTION OF WORK: <br />-Replace all timber In kind at bent on the Naneum road bridge. <br />-fill void under abutment <br />no trafidc control Is Included with this estimate. <br />ESTIMATE <br />LABOR DESCRIPTION QTY REG. HOURS <br />OIT HOURS <br />AMOUNT <br />Maintenance Lead Tech. <br />1 <br />60.0 1--LO= <br />.0 <br />$3,007.25 <br />Maintenance Mechanic 3 <br />7 <br />60.0 <br />0.0 <br />$18,943.35 <br />TOTAL LABOR ESTIMATE: <br />$21,950.60 <br />TYPE QTY <br />HOURS <br />AMOUNT <br />1 Ton; with Service Body; Gas <br />ff <br />1 <br />50.0 <br />$251.43 <br />han 38K GVWR; Crew Cab (Road Warrior) <br />1 <br />20.0 <br />$236.73 <br />Bridge Repair; without elevating pOatform <br />1 <br />50.0 <br />$479.10 <br />0653 - Truck; Bridge Repair Support; with Hydraulic boom <br />Crane; 54,000 GVW; 6x4 <br />1 <br />50.0 <br />$627.75 <br />TOTAL EQUIPMENT ESTIMATE: <br />$1,595.02 <br />MATERIAL TYPE <br />QTY <br />AMOUNT <br />$0.00 <br />TOTAL NAATERIAL ESTIMATE: <br />$0.00 <br />Page 1 DATE PRINTED: 12/20/2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.