My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01-09-minutes-public-works-study-session
>
Meetings
>
2017
>
02. February
>
2017-02-07 10:00 AM - Commissioners' Agenda
>
2017-01-09-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 1:40:57 PM
Creation date
5/12/2020 1:40:33 PM
Metadata
Fields
Template:
Meeting
Date
2/7/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
34676
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c A:q, F.. F:..0 <br />�- - . Ivcashuckf.�co.ki[flCas.wa.us' <br />Home Dashboard <br />Final Prospectus <br />Biennium: 2015 - 2017 <br />Projects Prespectus Help <br />Page I of 2 <br />Log Out <br />- �,. final P m.Urx.us <br />PROJECT IDENTIFICATION <br />Note: Identification Information is carried over from a preliminary prospectus, and cannot be changed. <br />Road Information <br />Number I possible.. I BMP I EMP I SMP x I EMP V ! EMP Y EF4P Y FF[TR� Desi' <br />6 yr T.I.P. Priority s; 4 <br />VICINITY MAP <br />Vicinity Map Attached: <br />ROADWAY CROSS-SECTION <br />Roadway Cross -Section Attached: - <br />DESCRIPTION OF PROPOSED IMPROVEMENTS <br />JARRATIVE <br />Kittitas County will rehabilitate this segment of Westside Road to provide improvements to an east -west corridor that connects with 1-90 <br />and Cie Elum. As growth and development continues to expand in this area, these road improvements are essential for public health <br />and safety. The 22' road needs to be widened to 28' and all weather surface improvements need to be added. Sldeslopes will be <br />improved to comply with the Design Manual and guardrail will be Installed where appropriate. <br />Deviation <br />Anticipated? <br />Roadway Structural Section, or Bridge Condition: <br />he overall roadway section Is intact. We only Ian to widen the road to include the 3 -foot shoulders. <br />Horizontal Alignment: <br />he project worksheet does not include any alignment corrections. Therefore, no points were added t the score. All deficiencies will be <br />noted and filed. <br />Vertical Alignment: <br />he project worksheet does not include any alignment corrections. Therefore, no points were added t the score. All deficiencies will ne <br />toted antl filetl. <br />Width: <br />he road will be widened from 22 feet to 28 feet resulting in two 3 -foot shoulders. <br />Other: Clear Zone, Slopes, Guardrail, Illumination, Signals, etc.: <br />here are rei:box pests, Dewar poles and trees impacting the clear zone. We plan to address these with guardrail, dearing and <br />oast. octroi of a to <br />nate mailbox posts. <br />RATING WORKSHEET <br />Rating Worksheet Attached- <br />https://www.crab.wa.gov['CRABRAP/county/prospectuslfinaUFina]ReadOnly.aspx"fD=2... 11/21/2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.