My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-12-12-minutes-public-works-study-session
>
Meetings
>
2017
>
02. February
>
2017-02-07 10:00 AM - Commissioners' Agenda
>
2016-12-12-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 1:40:56 PM
Creation date
5/12/2020 1:40:22 PM
Metadata
Fields
Template:
Meeting
Date
2/7/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
34676
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS <br />STUDY SESSION STAFF REPORT <br />STUDY SESSION DATE: December 12, 2016 <br />TOPIC: Teanaway Road Bridge at Dickey Creek Bridge Strike <br />ACTION REQUESTED: Information Only <br />LEAD STAFF: Mark R. Cook <br />RECOMMENDATION: <br />This is an informational briefing requiring no recommendation from the Board of <br />County Commissioners. <br />BACKGROUND: <br />On December 3, 2016, our Teanaway Road Bridge at Dickey Creek was struck <br />by a car removing the entire downstream bridge rail. Upper County Road <br />Foreman Chuck Reed responded deploying temporary warning devices — cones <br />and barricades. On Monday morning, bridge inspector Bamford and <br />Construction Manager Folk performed a detail inspection of the bridge. <br />Following their inspection, concrete Jersey barrier rail is now deployed restricting <br />the bridge to single lane traffic. The majority of debris from the crash has been <br />removed from the river. <br />DISCUSSION: <br />We have contacted our on-call structural engineer (Monte Smith — Sargent <br />Engineers) scheduling an inspection. County Road Engineer Huck has also <br />contacted the WSDOT bridge crew for a review determining their ability assisting <br />rail reconstruction. <br />Winter repair is unlikely. We have deployed advanced warning signs and <br />carsonite posts along the barrier rail — assisting night drivers locate the rail. <br />Once we understand the cost impact, we may need to amend the annual <br />construction program. <br />FISCAL IMPACTS: <br />At this time, it is our understanding that the individual responsible for the damage <br />has not been located. Cost recovery seems unlikely. <br />ATTACHMENTS: <br />Exhibit 1: Damage Photo <br />
The URL can be used to link to this page
Your browser does not support the video tag.