My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-04-25-minutes-public-works-study-session
>
Meetings
>
2017
>
02. February
>
2017-02-07 10:00 AM - Commissioners' Agenda
>
2016-04-25-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 1:42:59 PM
Creation date
5/12/2020 1:40:05 PM
Metadata
Fields
Template:
Meeting
Date
2/7/2017
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
34676
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS <br />WORK SESSION STAFF REPORT <br />WORK SESSION DATE: April 25, 2016 <br />TOPIC: Watershed Science and Engineering Task Order 11 Supporting <br />Replacement of the Lodge Creek Culvert at Via Kachess Road <br />ACTION REQUESTED: Authorize the Director's Signature on the Task <br />Order 11 with Watershed Science and Engineering <br />Supporting the Replacement of the Lodge Creek <br />Culvert at Via Kachess Road <br />LEAD STAFF: Mark R. Cook <br />RECOMMENDATION: <br />Authorize the Director's signature on the Task Order with Watershed Science <br />and Engineering supporting the replacement of the Lodge Creek Culvert at Via <br />Kachess Road. <br />BACKGROUND: <br />The recent failure of the Lodge Greek culvert at Via Kachess Road has been <br />evaluated by Washington State Department of Fish and Wildlife (WDFW). <br />WDFW is suggesting that a 22.5 foot bridge is appropriate for replacing the 60 <br />inch culvert. The culvert is currently a fish barrier. <br />DISCUSSION: <br />WDFWs culvert manual stipulates design criteria utilized by the department <br />when deciding the length of a structure crossing a stream. The criteria are highly <br />subjective. Our hydraulics and hydrology consultant (Watershed Science and <br />Engineering — WS&E) believes they can successful articulate a length under the <br />National Bridge Inventory System length of 20 feet. <br />Staff believes having WS&E perform the required delineation will significantly <br />reduce the cost of the design structure by reducing required structure length. It is <br />essential to define Hydrology (how much water) and Hydraulic (how fast) data for <br />culvert design. <br />FISCAL IMPACTS: <br />The cost of WS&E support services is $19,277.00. <br />Page 1 of 2 <br />PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.