Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
Dept. of Public Works <br />Page 2 <br />Safety Improvements Project to Petersen Brothers, <br />Inc. Commissioner Osiadacz seconded the motion. <br />Resolution No. 2016-138 was approved as presented. <br />MT. DANIELS DRIVE FOLLOW <br />UP DISCUSSION: Luke stated that the tree in the County right of way on Mt. <br />Daniels Drive was removed by the Eberhart's. There are <br />some weather concerns in getting the road complete and <br />the Eberhart's driveway will be completed in July of 2017 <br />when asphalt becomes available. <br />Board Direction: No Direction <br />OTHER BUSINESS: Mark gave a brief update on Blackhorse, stating that the <br />retention ponds are still the ongoing issue. There may be <br />some requirements from the Department of Ecology if an <br />injection well is installed due to drinking water standards. <br />He will go into more discussion at the special meeting <br />scheduled for Friday. <br />Luke gave an update on the Silica Road Bridge. The <br />bridge has been installed and there is some follow up work <br />to be completed for the KRD. The question of the gate <br />installation has come up. Luke contacted Urban Eberhart <br />with KRD with the belief that KRD wanted a gate installed. <br />After a conversation with Mr. Eberhart it was decided that <br />two gates were not necessary. Commissioner Jewell <br />commented that he'd like to see a gate installed because <br />of the damage that was caused to the bridge in the first <br />place. The Board directed staff to look into a solution for <br />protecting the bridge. <br />XAVzki <br />Mark Cook <br />Public Works Director <br />419 N. Ruby, Ste. #1 TEL (509) 962-7523 <br />Ellensburg, WA 98926 FAX (509) 962-7663 <br />