My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-24-minutes-public-works-study-session
>
Meetings
>
2016
>
12. December
>
2016-12-06 10:00 AM - Commissioners' Agenda
>
2016-10-24-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 1:39:46 PM
Creation date
5/12/2020 1:37:24 PM
Metadata
Fields
Template:
Meeting
Date
12/6/2016
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
33390
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
View images
View plain text
Dept. of Public Works <br />Page 2 <br />Safety Improvements Project to Petersen Brothers, <br />Inc. Commissioner Osiadacz seconded the motion. <br />Resolution No. 2016-138 was approved as presented. <br />MT. DANIELS DRIVE FOLLOW <br />UP DISCUSSION: Luke stated that the tree in the County right of way on Mt. <br />Daniels Drive was removed by the Eberhart's. There are <br />some weather concerns in getting the road complete and <br />the Eberhart's driveway will be completed in July of 2017 <br />when asphalt becomes available. <br />Board Direction: No Direction <br />OTHER BUSINESS: Mark gave a brief update on Blackhorse, stating that the <br />retention ponds are still the ongoing issue. There may be <br />some requirements from the Department of Ecology if an <br />injection well is installed due to drinking water standards. <br />He will go into more discussion at the special meeting <br />scheduled for Friday. <br />Luke gave an update on the Silica Road Bridge. The <br />bridge has been installed and there is some follow up work <br />to be completed for the KRD. The question of the gate <br />installation has come up. Luke contacted Urban Eberhart <br />with KRD with the belief that KRD wanted a gate installed. <br />After a conversation with Mr. Eberhart it was decided that <br />two gates were not necessary. Commissioner Jewell <br />commented that he'd like to see a gate installed because <br />of the damage that was caused to the bridge in the first <br />place. The Board directed staff to look into a solution for <br />protecting the bridge. <br />XAVzki <br />Mark Cook <br />Public Works Director <br />419 N. Ruby, Ste. #1 TEL (509) 962-7523 <br />Ellensburg, WA 98926 FAX (509) 962-7663 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).