My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-03-28-minutes-public-works-study-session
>
Meetings
>
2016
>
12. December
>
2016-12-06 10:00 AM - Commissioners' Agenda
>
2016-03-28-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 1:37:08 PM
Creation date
5/12/2020 1:36:05 PM
Metadata
Fields
Template:
Meeting
Date
12/6/2016
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
33390
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
No. 6 Road Overcrossing Towne Ditch Bridge Replacement <br />Kittitas County, Washington <br />Prepared for: Monte Smith, Sargent Engineers <br />ESTIMATED LABOR: <br />Proj. No.: P-4102 <br />Dale: <br />319/2016 <br />Prepared By: <br />REK <br />Revised: <br />Pnrj. Brsl 1-1 <br />WORK TASK DESCRIPT[ON <br />RanGEO Labor Hours & 2016 Ditect Hourly Rates <br />Est_ NV <br />PdntlralGeot. <br />Proj-%1gr. Sr -Gear. rn,- <br />Sc Geologist <br />Pnrj. Brsl 1-1 <br />Admin. <br />Cast <br />Shear Stwt%,h(rockco,t,,,o l) <br />0 <br />STils <br />5(3.0.5 550.75 <br />53500 <br />ill )5 <br />Y�855 <br />('QS]• <br />F Ad Fxpinrauo &Lab Testing <br />Existing Information Rere <br />S to Recon Mark Bonne 1 n.at ons <br />0 <br />r <br />6 <br />L <br />Anedx,ol Limlts <br />$372.30 <br />Log Test Barings <br />$95 <br />2 <br />—�— <br />12— <br />$16 <br />$456.00_ <br />$276.10 <br />Dmft Lugs & Leb S np;a Select o: <br />E gmmnng Analysis <br />-' <br />--- <br />._ <br />Wall Backfill Dksgn Recortumraaaors <br />2 <br />r 2 <br />$190.00 n3_]0 <br />d os <br />daourcoun <br />--- <br />}-- <br />1 <br />0 <br />$387J_0 <br />-u <br />CUorrn C.nddarsons <br />- <br />SIN 10 <br />Geotmhntd Re <br />an:ost <br />Groe <br />Final Otomchnicnl Kepon <br />q <br />12 2 <br />$380.00_ <br />v ..o 11 <br />LABORATORYTEST SUMMARY <br />$9.390 <br />Est_ NV <br />Unit <br />Total <br />Test <br />'li sts <br />Cost <br />Cast <br />Shear Stwt%,h(rockco,t,,,o l) <br />0 <br />$225 <br />$0 <br />Simi Analis <br />3 <br />$120 <br />$360 <br />Pcrcznt rhre <br />0 <br />$20 <br />S0 <br />Anedx,ol Limlts <br />1 <br />S95 <br />$95 <br />Moisture Content <br />4 <br />$16 <br />$64 <br />n.rna, r,novn,u srrcr rnau�s,: <br />mined Conditions <br />See scope of work. <br />$519 <br />0V -- 2 $3,660.00 <br />OVERHEAT/ & PROFIT: <br />$9.390 <br />OcerheA C 12655,, & DSC <br />$4,632 <br />Profit @ 30% or DSC <br />$1,098 <br />'rt1T'AL IMOR COSTS: <br />$9390 <br />ESTIMATED DIRECT' rXPr,NSFS: <br />$9.390 <br />Per diem 0 @ $I 94/day <br />$0 <br />Milcagc 500 @ 50.54/nri. <br />$270 <br />Field Consumable <br />.$20 <br />"rOTAL DIRECT EXPENSES: <br />$290 <br />SUBCONTRACTOR COSTS: <br />$9.390 <br />Doll Rig Mobllimtlon r <br />$800 <br />Dill Had.,,, (2 ea- 120 Lfos lm al) <br />$3600 <br />TOTAL SUBCONTRACT COSTS: <br />$4,400 <br />10'al lAs' cost <br />$9.390 <br />larb "1 "s to <br />$519 <br />DlrmrExpcn.ws <br />$290 <br />stbc ntnac'e' l6 <br />$4.400 <br />TOTAL: <br />$'14,599 <br />ParOGEO, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.