Laserfiche WebLink
February 03, 2016 <br />Mr. Michael Meskimen <br />Mr. Don M. Tulloch <br />Gray & Osborne, Inc. <br />107 South Third Street <br />Yakima, WA 98901 <br />HITTZTAiS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />Mark R. Cook, PE Director <br />RE: PS&E City of Kittitas, Patrick Avenue Improvements Phase 1 <br />Gentlemen: <br />I have reviewed the PS&E provided for City of Kittitas, Patrick Avenue Improvements Phase 1. <br />My review comments appear below for your consideration. <br />1. Cover sheet signature request: I will sign the cover once the design engineers have <br />signed and dated their stamps. <br />2. Please sign and date the seals on the cover of the PS&E package with your response <br />submittal. <br />3. Please revise the opening date once we have agreed on the final issue date for the <br />revised PS&E package. <br />4. The project limits total 1,080 feet and not the 1,100 as shown on the "Call for Bids'. <br />Please advise if the 1,100 is intended to be an approximate value. <br />5. Division 1, General Requirements Description of Work Please see comment no. 4 <br />above. <br />6. Page 1-2, line no. 27: Please change "Contracting Agency' to "Certified Agency". <br />Please ensure the there is a prior reference to Kittitas County Public Works as the <br />Certified Agency. Please be advised that we will require a record of all project costs prior <br />to project closeout. <br />7. Page 1-3. Notice of Award and Notice to Proceed: Please be advised that if is our <br />understanding that the City of Kittitas desires Gray and Osborne, Inc. provide <br />construction management services for this project. To date, Kittitas County does not <br />appear to have been significantly involved in the project. I desire a meeting with G&O <br />project management prior to final signatory on the PS&E package defining roles and <br />expectations. We will review and manage all financial reporting as certified agency. <br />Other aspects of project management can easily be deferred once we have a better <br />understanding of the project management package that G&O is proposing for the City. <br />8. Page 1-6. 1-02.9 and Page 1-7 1-02.13: 1 note that there is no discussion about <br />proposal whose delivery is inconsistent with delivery requirements. Is it your position that <br />a proposal submitted without proper Project Name and Project Number on the envelope <br />will be accepted? <br />9. Page 1-23, 1-05.11(2): Please be advised that Kittitas County will conduct the final <br />inspection with the project engineer and any required additional attendees. <br />10. Page 1-25, 1-05.15: Please include Kittitas County on all notices. <br />11. Page 1-06.1(4) Fabrication Inspection Expense The section is deleted. Are there no <br />project components requiring fabrication inspection? Please excuse our ignorance in <br />411 N. Ruby St, Suite #1 TEL (509) 962-7523 <br />Ellensburg, WA 98926 FAX (509) 962.7663 <br />