My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-12-28-minutes-public-works-study-session
>
Meetings
>
2016
>
12. December
>
2016-12-06 10:00 AM - Commissioners' Agenda
>
2015-12-28-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 1:39:54 PM
Creation date
5/12/2020 1:35:27 PM
Metadata
Fields
Template:
Meeting
Date
12/6/2016
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
33390
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 19, 2013 <br />The airport has not had any recent projects or goalstaccomplishmerds. <br />FY Total Grant$Amount <br />-- �_ <br />DBE Goals Accrun 'Yshment Tupe of work <br />RC RN Total RC RN Total <br />FY 10 <br />---_ <br />FY11 <br />-- I <br />FY 17 <br />FY 13 <br />iY 14 <br />; <br />The proposed Overall DBE Goals are as follows: <br />© Fiscal Year #f — 0% <br />d Fiscal Year #2 —no anticipated projects <br />13 Fiscal Year 43 —no anticipated projects <br />Our proposed overall three yeargoal will be reflected as — 0% <br />There is no historical DBE data to reference to make an adjustment to the Step 1 base Figure <br />therefore, the Airport Authority is adopting its Step 1 base frgure as its overall goal for this three- <br />yeargoel period. <br />Should additional project funding become available forprojects in 2016 or 2017, the airport wNl <br />reassess the available DBE firms and adjust the goal accordingly. <br />Breakout of Estimated "Race and Gender Neutral" (RN) and "Race and bender <br />Conscious" (RC) Participation. <br />26.6'i(b) (9-9) <br />The recipient will meet the maximum feasible portion of its overall goal by using RN means of <br />facilitating DBE participation. <br />1_ Arranging solfbitations, times for the presentation ofbids, quantities, speoifrcations, <br />and delivery schedules in ways that facilitates DBE, and other small businesses, <br />participation; <br />2. Ensuring distribution of DBE directory, through print and electronic means, to the <br />widest feasible universe ofpotentielprrme contractors; <br />The recipient estimates that in meeting its overall goal 0%, it will obtain 0% from RN <br />participation and 0% through RC measures. <br />The will adjust the estimated breakout of RN and RC <br />DBE participation as needed to reflect actual DBE participation (see Section 26.51(1)) and track <br />and report RN and RC participation separately. For reporting purposes, RN DBE participation <br />includes, but is not necessarily limited to, the following; DBE participation through a prime <br />contract obtained through customary competitive procurement procedures; DBE participation <br />through a subcontract on a prime contract that does not carry a DBE goal, DBE participation on <br />a prime contract exceeding a contract goal and DBE participation through a subcontract from a <br />prime contractor that did not consider a firm's DBE status In making the award. <br />Page 29 of 44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.