My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-12-28-minutes-public-works-study-session
>
Meetings
>
2016
>
12. December
>
2016-12-06 10:00 AM - Commissioners' Agenda
>
2015-12-28-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 1:39:54 PM
Creation date
5/12/2020 1:35:27 PM
Metadata
Fields
Template:
Meeting
Date
12/6/2016
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
33390
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 19, 2015 <br />reconsideration process is not administratively appealable to the Department of <br />Transportation. <br />.GQQ-d Faith Efforts procedures in situations when there are contract acals 26.53 <br />We will include in each prime contract a provision stating: <br />The contractor shall utilize the specific DBEs listed to perform the work and <br />supply the materials for which each is listed unless the contractor obtains your <br />written consent and <br />That, unless our consent is provided , the contractor <br />shall not be entitled to any payment for work or material unless it is performed or <br />supplied by the listed DBE. <br />We will require the contractor that is awarded the contract to make available upon <br />request a copy of all DBE subcontracts. The subcontractor shall ensure that all <br />subcontracts or an agreement with DBEs to supply labor or materials require that the <br />subcontract and all lower tier subcontractors be performed in accordance with this part's <br />provisions. <br />In this situation, we will require the prime contractor to obtain our prior approval of the <br />substitute DBE and to provide copies of new or amended subcontracts, or <br />documentation of good faith efforts. <br />We will require that a prime contractor not terminate a DBE subcontractor listed in <br />response to paragraph (b)(2) of this section (or an approved substitute DBE firm) <br />without our prior written consent This includes, but not limited to, instances in which a <br />prime contractor seeks to perform work originally designated for a DBE subcontractor <br />with its own forces or those of an affiliate, a non -DBE firm, or with another DBE firm. <br />We will provide such written consent only if we agree, for reasons stated in our <br />concurrence document, that the prime contractor has good cause to terminate the DBE <br />firm. For purposes of this paragraph, good cause includes the following circumstances: <br />The listed DBE subcontractor falls or refuses to execute a written <br />contract; <br />The listed DBE subcontractor fails or refuses to perform the work of its <br />subcontract in a way consistent with normal industry standards. Provided <br />however, that good cause does not exist if the failure or refusal of the DBE <br />subcontractor to perform its work on the subcontract results from the bad faith or <br />discriminatory action of the prime contractor; <br />. The listed DBE subcontractor fails or refuses to meet the prime <br />contractor's reasonable, non-discriminatory bond requirements. <br />MU4 —The listed DBE subcontractor becomes bankrupt, insolvent, or exhibits <br />credit unworthiness; <br />Page 16 of 44 <br />rvrm, - -, , : Lidex Let 13.7, No bulreb or <br />numbering <br />
The URL can be used to link to this page
Your browser does not support the video tag.