|
DOT RGGB01
<br />PSGE JOB NO :16X308
<br />REVISIOK NO
<br />CONTRACT NO ;008888
<br />REGION NO :4
<br />VERSION NO :2
<br />WORK ORDER : XL4642
<br />SNR :SR 142
<br />------- 4TH BIDDER -------
<br />TITLE ;SR 142
<br />------- 5TH BIDDER -------
<br />XLICEZTAT RIVER BRID(NE
<br />REPLACE BRIDGE
<br />STELLAR J. CORPORATION
<br />164308
<br />9210 NE 62ND AVE
<br />PROJECT , STPF-0142(0£3)
<br />99336-3472
<br />COUNTY(S) :KLICHITAT
<br />ITEM ITEM DESCRIPTION
<br />UNIT
<br />170. EST. QUANTITY
<br />iNEU
<br />TRAFFIC
<br />ERGR'S. EST.
<br />59 FLEaBLE GUIDE POST
<br />12.0000
<br />EACH
<br />60 PANT LINE
<br />1680.0000 L. F.
<br />61 PLASTIC DRAINAGE MARJUNG
<br />3.0000 EACH
<br />62 RECESSED PAVEMENT MARY.ER
<br />0.1000 BUND
<br />63 PERMANENT SIGNING
<br />L. S.
<br />64 TEMPORARY FAVE ENT MARKING -LONG DURATION
<br />1034.0000 L.F.
<br />65 CONDUIT PIPE 2 IN. DIAM.
<br />950.0000 L. F.
<br />66 PROJECT TENPCRARY TRAFFIC CONTROL
<br />L.S.
<br />61 CONSTRUCTION SIGNS CLASS J,
<br />268.0000 S.F.
<br />WASHINGTON STATS DEPARTMENT OF TRANSPORTATION DATE: 03/=41.'"16
<br />• • BID CHECK REPORT • s s TIME: 07.57
<br />100.0000
<br />1,200.00
<br />1.2500
<br />2,100.00
<br />150.0000
<br />450.00
<br />1,000.0000
<br />100.00
<br />8,600.00
<br />2.5000
<br />2,505.00
<br />16.0000
<br />15,200.00
<br />141,194.00
<br />10.0000
<br />4,824.00
<br />134.8700 34.871
<br />1,618.44 416.44
<br />1.3500 8.00%
<br />2,268.00 168.00
<br />107.8900 -28.074
<br />323.67 -126.33
<br />37,762.3000 3,676.234
<br />3,776.23 3,676.23
<br />-2.471
<br />8,387.55 -212.45
<br />4.3200 72.80%
<br />4,466.88 1,861.88
<br />19.4200 22.381
<br />18,449.00 3,249.00
<br />-62.49 %
<br />52,964.33 -88,229.67
<br />17.2600 -4.11%
<br />4,625.66 -198.32
<br />OTSER ITEMS
<br />68 SCHEDULE 80 PVC CONDUIT 4 IN. DIAN.
<br />340.0000 L. F. 18.0000 43.1600 139.79%
<br />6,120.00 14,674.40 8,554.40
<br />140.0000 40.00%
<br />1,680.00 450.00
<br />1.7000 36.00 %
<br />2,656.00 756.00
<br />110.0000 -26.67%
<br />330.00 -120.00
<br />39,000.0000 3,000.00%
<br />3,900.00 3,800.00
<br />-41.06 %
<br />5,000.00-3,600.CC
<br />4.4000 76.00 %
<br />4,549.60 1,964.60
<br />20.0000 25.00%
<br />19,000.00 3,800.00
<br />-78.754
<br />30,000.00 -111,194.00
<br />17.0000 -5.561,
<br />4,556.00 -260.00
<br />70.0000 288.69%
<br />23,800.00 17,680.CC
<br />125.0000 25.004
<br />1,500.00 300.00
<br />1.2500 (1.0014
<br />2,100.CC 0.00
<br />100.00"0 -33.334
<br />300.00 -150.00
<br />35,000.0000 3,400.00%
<br />3,500.00 3,400.00
<br />-6.984
<br />8,000.0" -600.00
<br />4.0000 60.00%
<br />4,136.00 1,531.00
<br />20.0000 25.001t
<br />19,000.00 3,SC0.00
<br />-50.424
<br />70,000.00 -71,194.00
<br />30.0000 66.67 4
<br />8,040.00 3,216.00
<br />40.0000 122.224
<br />13,600.00 7,480.00
<br />BIDS OPENED 1�
<br />AWARDED ON : Ayr 25 2016
<br />------- 4TH BIDDER -------
<br />" --" 6TH BIDDER
<br />------- 5TH BIDDER -------
<br />APOLLO, INC.
<br />ROTSCHY, IHC.
<br />STELLAR J. CORPORATION
<br />1133 W COLUMBIA OR
<br />9210 NE 62ND AVE
<br />1363 DOWN RIVER DR
<br />99336-3472
<br />XERWEWICK WA 993360617
<br />VANCOUVER WA 986659303
<br />WOODLAND WA 986749546
<br />CONTRACTOR NUMBER 100265
<br />CONTRACTOR NLIGM 100156 CONTRACTOR NUMBER 101038
<br />ERGR'S. EST.
<br />__ ii -E PRICE PER UNIT/ 4 DIFF./
<br />r
<br />PRICE PER UNIT/ % DIFF./
<br />PRICE PER UNIT/ R "IFF./
<br />TOTAL AMOUNT TOTAL AMOUNT M.DIFF.
<br />TOTAL AMOUNT AMT.DIFF.
<br />TOTAL AMOURS ANT.DIFF.
<br />100.0000
<br />1,200.00
<br />1.2500
<br />2,100.00
<br />150.0000
<br />450.00
<br />1,000.0000
<br />100.00
<br />8,600.00
<br />2.5000
<br />2,505.00
<br />16.0000
<br />15,200.00
<br />141,194.00
<br />10.0000
<br />4,824.00
<br />134.8700 34.871
<br />1,618.44 416.44
<br />1.3500 8.00%
<br />2,268.00 168.00
<br />107.8900 -28.074
<br />323.67 -126.33
<br />37,762.3000 3,676.234
<br />3,776.23 3,676.23
<br />-2.471
<br />8,387.55 -212.45
<br />4.3200 72.80%
<br />4,466.88 1,861.88
<br />19.4200 22.381
<br />18,449.00 3,249.00
<br />-62.49 %
<br />52,964.33 -88,229.67
<br />17.2600 -4.11%
<br />4,625.66 -198.32
<br />OTSER ITEMS
<br />68 SCHEDULE 80 PVC CONDUIT 4 IN. DIAN.
<br />340.0000 L. F. 18.0000 43.1600 139.79%
<br />6,120.00 14,674.40 8,554.40
<br />140.0000 40.00%
<br />1,680.00 450.00
<br />1.7000 36.00 %
<br />2,656.00 756.00
<br />110.0000 -26.67%
<br />330.00 -120.00
<br />39,000.0000 3,000.00%
<br />3,900.00 3,800.00
<br />-41.06 %
<br />5,000.00-3,600.CC
<br />4.4000 76.00 %
<br />4,549.60 1,964.60
<br />20.0000 25.00%
<br />19,000.00 3,800.00
<br />-78.754
<br />30,000.00 -111,194.00
<br />17.0000 -5.561,
<br />4,556.00 -260.00
<br />70.0000 288.69%
<br />23,800.00 17,680.CC
<br />125.0000 25.004
<br />1,500.00 300.00
<br />1.2500 (1.0014
<br />2,100.CC 0.00
<br />100.00"0 -33.334
<br />300.00 -150.00
<br />35,000.0000 3,400.00%
<br />3,500.00 3,400.00
<br />-6.984
<br />8,000.0" -600.00
<br />4.0000 60.00%
<br />4,136.00 1,531.00
<br />20.0000 25.001t
<br />19,000.00 3,SC0.00
<br />-50.424
<br />70,000.00 -71,194.00
<br />30.0000 66.67 4
<br />8,040.00 3,216.00
<br />40.0000 122.224
<br />13,600.00 7,480.00
<br />
|