|
DDT_RR®Ol
<br />DATE: 03/24/2016
<br />PSER JOR NO: lWa8
<br />REVISION NO
<br />CONTRACT NO :008888
<br />REGION NO :4
<br />VERSION W ;2
<br />MORN OiRDERB : XL4642
<br />EWY : SR 142
<br />-1,125.00
<br />TITLE :8R 142
<br />--- ATE BIDDER
<br />XL TAT RIVER BRIDGE
<br />REPLACE SRID6g
<br />APO=, Inc.
<br />16X308
<br />STELLAR J. CORPORATION
<br />PROJECT , $TPF -0142(02))
<br />9210 RE 62X0 AVE
<br />COUNTY(S) :KLICKITAT
<br />99336-3472
<br />ITEM ITEM DESCRIPTION
<br />UNIT
<br />NO. EST. QUANTITY
<br />!ORAS
<br />GRADING
<br />11 EURANKIMT CCEPACTIDR
<br />450.0000 C.Y.
<br />DRAINAGE
<br />12 QUARRY SPALLS
<br />155.0000 TOM
<br />13 UNDERDBAIN PIPE 6 IN. DIAM.
<br />60.0000 L.S.
<br />14 CL. V REINF. CONC. CULV. PIPE 18 IN. DIAM.
<br />117.0000 L.r.
<br />Loll :YYl11
<br />15 CATCH BASIN TIPS 1
<br />3.0000 EACH
<br />16 SCHEDULE A STORK SEATER PIPE 12 IN. DIM.
<br />89.0000 L.F.
<br />WASHINGTON STATE DEPARTMENT Or TRANSPORTATION
<br />DATE: 03/24/2016
<br />. + • BID CHECK REPORT • • •
<br />2.5000
<br />2mm:07:57
<br />2,250.00
<br />5,490.00
<br />BIDS OPENED OM
<br />1,125.00
<br />-1,125.00
<br />AWARDED ON : Apr 25 2016
<br />--- ATE BIDDER
<br />GTE BIDDER
<br />------- STS BIDDER -------
<br />APO=, Inc.
<br />ROTSCBY, Inc.
<br />STELLAR J. CORPORATION
<br />1133 W COLUMBIA DR
<br />9210 RE 62X0 AVE
<br />1363 DOWN RIVER DR
<br />99336-3472
<br />30.1500
<br />20.60 4
<br />IRENNEWICK WA 993360617
<br />VANCOUVER WA 966659303
<br />WOODLAND WA 966749546
<br />CONTRACTOR NOBBER 100265 CONTRACTOR NUMBER 100156 CONTRACTOR NUMBER 101038
<br />ENGR'S. LST,
<br />1,080.00
<br />-420.00
<br />PRICE PER UNIT/ PRICE PER UNIT/ 4 DI"./
<br />PRICE PER UNIT/ % DIFF./
<br />PRICE PER UNIT/ % Dirr./
<br />TOTAL AMOUNT TOTAL AMOUNT ANT. DIFF.
<br />TOTAL AMOUNT AMT.DI",
<br />TOTAL AMOUNT ANT.DIFF.
<br />5.0000
<br />12.2000
<br />144.006
<br />2.5000
<br />-50.004
<br />2,250.00
<br />5,490.00
<br />3,240.00
<br />1,125.00
<br />-1,125.00
<br />45.0000
<br />46.3100
<br />2.91 %
<br />20.000D
<br />-55.561
<br />6,975.00
<br />7,178.05
<br />203.05
<br />3,100.00
<br />-3,075.00
<br />25.0000
<br />30.1500
<br />20.60 4
<br />18.0000
<br />-28.00 %
<br />1,500.00
<br />1,809,00
<br />309.00
<br />1,080.00
<br />-420.00
<br />125.0000
<br />90.1200
<br />-35.90 4
<br />90.0000
<br />-28.00 4
<br />14,625.00
<br />9,374.04
<br />-5,250.96
<br />10,530.00
<br />-4,095.00
<br />2,250.0000
<br />6,750.00
<br />45.0000
<br />4,005.00
<br />1,493.9900 -33.60 %
<br />4,461.97 -2,268.03
<br />15.2700 -66.074
<br />1,359.03 -2,645.97
<br />STRUCTURE
<br />17 STRUCTURE EXCAVATION CLASS A INCL. HAUL
<br />192.0000 C.Y. 25.0000 69.7600 179.041,
<br />4,800.00 13,393.92 8,593.92
<br />18 SOIL EXCAVATION FOR SHAFT INCLUDING HAUL
<br />96.0000 C.Y. 500.0000 2,209.4300 341.894
<br />48,000.00 212,105.28 164,105.28
<br />1,500.0000 -33.33 6
<br />4,500.00 -2,250.00
<br />53.00DO 17.78 4
<br />4,717.00 712.00
<br />35.0000 40.00%
<br />6,720.00 1,920.00
<br />2,000.0000 300.006
<br />192,000.00 144,000.00
<br />12.0000 240. OC 0
<br />5,400.00 3,150.00
<br />41.0000 -8.896
<br />6,355.00 -620.00
<br />27.0000 B .AC 4
<br />1,620.00 120.00
<br />60.0000 -52.004
<br />7,020.00 -7,605.00
<br />1,500,0000 -33.33k
<br />4,500.0a -2,250.00
<br />62,0000 37.78%
<br />5,518.00 1,513.00
<br />34.0000 36.004
<br />6,528.00 1,728.00
<br />1,500.0000 200.00%
<br />144,000.00 96,000.00
<br />
|