|
DOT_AGGBOI
<br />WASHINGTON STATS DEPARTMENT OF TRANSPORTATION
<br />DATE: 03/24/2016
<br />'
<br />* • BID CHECK IMPORT i * i
<br />TDMs 07:57
<br />PSGE ,TCB NO: 16X906 REVISION NO
<br />BIDS OPENED ON '
<br />CONTRACT NO :008888 REGION NO :4
<br />AWARDED ON : Apz 25 2016
<br />VERSION 210 :2 WORE ORDER4 :XL4642
<br />BUY
<br />:SR 142
<br />------- LOW BIDDER-------
<br />2ND BIDDER ----" -
<br />------- 3RD BIDDER-------
<br />TITLE
<br />:SR 142
<br />M.J. HUGHES CONSTRUCTION, INC
<br />LEOACY CONTRACTING, INC.
<br />CASCADE BRIDGE LLC
<br />KLICKITAT RIVER BRIDGE
<br />11510 NE 87TH AVE
<br />41850 KINGSTON JORDAN RD
<br />142%5 RW 3RD COURT
<br />REPLACE BRIDGE
<br />16X300
<br />97383-5704
<br />PROJECT , STPF-0142(073)
<br />VANCOUVER WA 986621345
<br />STAYTOI4 OR 973833000
<br />vANCODVER WA 986055760
<br />COUNTY(B) : KLICKITAT
<br />CONTRACTOR XOMBER
<br />100214
<br />CONTRACTOR NUMBER
<br />: 100873
<br />CONTRACTOR NIBBBR
<br />100412
<br />ENGR'8. EST.
<br />ITEM
<br />ITEM DESCRIPTION UNIT
<br />PRICE PER UNIT/
<br />PRICE PER UNIT/
<br />t DIFF./
<br />PRICE PER UNIT/
<br />t DIFF./
<br />PRICE PER UNIT/
<br />% CIPF./
<br />NO.
<br />EST. QUAXTITY MEAS
<br />TOTAL AMOUNT
<br />TOTAL AMOUNT
<br />AMT.DIFF.
<br />TOTAL AMOUNT
<br />ANT. DIFF.
<br />TOTAL AMOUNT
<br />AMI.DIFF.
<br />HOT MIX ASPHALT
<br />39
<br />COPACTION PRICE ADJU87M NT
<br />CALL
<br />0.00 11
<br />0.00 4
<br />0.00%
<br />910.00
<br />910.00
<br />910.00
<br />910.00
<br />40
<br />ASPHALT COST PRICE ADJUSTMENT
<br />CALL
<br />0.00 4
<br />0. 00 %
<br />0.0G%
<br />-1.00
<br />-1.00
<br />-1.00
<br />-1.CC
<br />41
<br />COMMERCIAL 8831
<br />280.0000 TCN
<br />130.0000
<br />325.0000
<br />150.0011
<br />127.0000
<br />-2.314
<br />125.0000
<br />-3.954
<br />36,400.00
<br />91,000.00
<br />54,600.00
<br />35,560.00
<br />-840.00
<br />35,000.00
<br />-1,400.00
<br />42
<br />LONGITUDINAL JOINT BEAL
<br />92.0000 L.F.
<br />45.0000
<br />40.0000
<br />-11.114
<br />47.5000
<br />5.56 t
<br />33.0000
<br />-29.674
<br />4,140.00
<br />3,680.00
<br />-460.00
<br />4,370.00
<br />230.00
<br />3,036.00
<br />-1,104.00
<br />EROSION CONTROL AND ROADSIDE PLANTING
<br />43
<br />EROSION CONTROL AND WATER POLLUTION PREVENTION
<br />L.S.
<br />-92.SD%
<br />-83.77 11
<br />-75.004
<br />100,000.00
<br />1,500.00
<br />-92,5C0.00
<br />16,235.00
<br />-83,765.00
<br />25,000.00
<br />-75,000.00
<br />44
<br />COMPOST BLANKET
<br />1800.0000 S.Y.
<br />4.0000
<br />2.5000
<br />-37.50%
<br />4.5500
<br />13.750
<br />4.250C
<br />6.251
<br />7,200.00
<br />4,500.00
<br />-2,700.00
<br />6,190.00
<br />990.00
<br />7,650.00
<br />450.00
<br />45
<br />SEEDING, FERTILIZING, MULCHnM - SITE ROADSIDE
<br />0,2000 ACRE
<br />6,000.0000
<br />12,000.0000
<br />100.00%
<br />7,090.0000
<br />31.50%
<br />13,500.0000
<br />125.0011
<br />1,200.00
<br />2,400.00
<br />1,200.00
<br />1,578.00
<br />378.00
<br />2,700.00
<br />1,500.00
<br />46
<br />TOPSOIL TYPE C
<br />0.5000 ACRE
<br />7,000.0000
<br />17,500.0000
<br />150.00%
<br />6,200.0000
<br />17.14%
<br />29,500.0000
<br />321.434
<br />3,500.00
<br />8,750.00
<br />5,250.00
<br />4,100.00
<br />600.00
<br />14,750.00
<br />11,250.00
<br />47
<br />BARK OR WOOD CHIP KULCH
<br />0.3000 ACRE
<br />16,000.0000
<br />7,000.0000
<br />-56.254.
<br />7,800.0000
<br />-51.25%
<br />32,500.0000
<br />103,13%
<br />4,800.00
<br />2,100.CD
<br />-2,700.00
<br />2,340.00
<br />-2,460,06
<br />9,750.CC
<br />4,950.00
<br />48
<br />WEED AID PEST CONTROL CHEMICAL APPLICATION
<br />10.0000 ia'
<br />100.0000
<br />120.0000
<br />20.0011
<br />100.0000
<br />0.001
<br />170.0000
<br />741.00%
<br />1,000.00
<br />1,200.00
<br />200.00
<br />1,000.00
<br />0.00
<br />1,700.00
<br />700.00
<br />
|