My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-13-minutes-public-works-study-session
>
Meetings
>
2016
>
11. November
>
2016-11-01 10:00 AM - Commissioners' Agenda
>
2016-06-13-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 1:37:23 PM
Creation date
5/12/2020 1:33:56 PM
Metadata
Fields
Template:
Meeting
Date
11/1/2016
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
32766
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
products to community officials and the general public for review and comment. FEMA may audit or <br />assist in these activities if deemed to be necessary by the Regional Project Officer. The activities to be <br />performed are summarized below. <br />Standards: All Preliminary Distribution work shall be performed in accordance with the standards <br />specified in Section 5 – Standards. <br />Deliverables: The CTP shall make the following products available to FEMA by uploading the digital <br />data to the MIP or by distributing the deliverables as noted, in accordance with the schedule outlined in <br />Section 6 – Schedule. <br />• Preliminary transmittal letters shall be prepared and transmitted. <br />• A preliminary copy of the FIRM and FIS report, including all updated data tables and Flood <br />Profiles shall be mailed to the Chief Executive Officer (CEO) and floodplain administrator of <br />each affected community, all other Project Team members, the State NFIP Coordinator, the <br />FEMA Regional Office, and others as directed by FEMA. <br />• Preliminary SOMAs, prepared in accordance with FEMA requirements, shall be provided as <br />appropriate. <br />N <br />• <Optional bullet; remove depending on Region> A self -certification document outlining the <br />funded scope and comments per Region discretion. <br />SECTION 2—Technical and Administrative Support Data Submittal <br />The Project Team members for this Flood Risk Project that have responsibilities for activities included in <br />this MAS shall comply with the data submittal requirements summarized below. and in appropriate <br />guidance. <br />All supporting documentation for the activities in this MAS shall be submitted according to FEMA <br />standards and requirements, and will include a FEDD folder. Submittals must be made to the appropriate <br />PTS for a review of required materials. The CTP will respond to requests from FEMA or its contractors <br />for additional information and ensure that all required documents are included in the TSDN. <br />If any issues arise that could affect the completion of an activity within the proposed scope or budget, the <br />CTP shall complete and submit to FEMA a Special Problem Report (SPR) as soon as possible after the <br />issue is identified. The SPR describes the issue and proposes possible resolutions. For additional <br />information on SPRs, consult the Regional Office. <br />Information supporting FEMA standards and requirements regarding the TSDN and FEDD file may be <br />found in the Data Capture Technical Reference and other associated guidance documents. <br /><Include only those tasks listed below that apply to this Flood Risk Project in Table 2.I > <br />Table 2.1: TSDN Section Mapping Activities <br />National FY16 Flood Risk Project MAS Template Version 1.0 <br />Mapping Activity Statement No. {MASNo 1 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.