My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-08-08-minutes-public-works-study-session
>
Meetings
>
2016
>
10. October
>
2016-10-04 10:00 AM - Commissioners' Agenda
>
2016-08-08-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 1:32:59 PM
Creation date
5/12/2020 1:30:50 PM
Metadata
Fields
Template:
Meeting
Date
10/4/2016
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
32188
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tract or parcel of land or other property, and also designating thereon all <br />property which is being purchased under contract from the county. The <br />resolution of intention shall be published in at least two consecutive issues of a <br />newspaper of general circulation in such county, the date of the first publication <br />to be at least fifteen days prior to the date fixed by such resolution <br />for hearing before the board of county commissioners. <br />Notice of the adoption of the resolution of intention shall be given each <br />owner or reputed owner of any lot, tract or parcel of land or other property <br />within the proposed improvement district by mailing said notice to the owner or <br />reputed owner of the property as shown on the tax rolls of the county treasurer <br />at the address shown thereon at least fifteen days before the date fixed for the <br />public hearing. The notice shall refer to the resolution of intention and designate <br />the proposed improvement district by number. Said notice shall also set forth <br />the nature of the proposed improvement, the total estimated cost, the <br />proportion of total cost to be borne by assessments, the estimated amount of <br />the cost and expense of such improvement to be borne by the particular lot, <br />tract or parcel, the date and place of the hearing before the board of county <br />commissioners, and the fact that property owners may withdraw their names <br />from the petition or add their names thereto at any time prior to five o'clock p.m_ <br />of the day before the hearing. <br />[ 1963 c 4 § 33.88.460. Prior. 1551 c 1S2 § 6.1 <br />DISCUSSION: <br />The process described above allows construction of requested improvements in <br />late September 2016. Anticipating late construction, maintenance utilized "high <br />float" oil during the gravel road upgrade this year to Schnebly Road. This <br />construction verifies our ability delivering the project in late September 2016. <br />RID participates have previously been presented preliminary costs associated <br />with the improvement and all have indicated acceptance. One property owner, <br />the original land owner and subsequent developer of the community, has not <br />attached to the petition but has verbally committed to participating and owns <br />several lots within the proposed RID boundary. <br />FISCAL IMPACTS: <br />Public Works is estimating the total cost of RID improvements at $130,000 (15 <br />years). Preliminary costs have been reviewed and given initial approval by all <br />petitioners. The initial cost of the RID is proposed to come from Public Works <br />cash reserves (this negates the need for a bond sale and associated costs). <br />Annual payments from petitioners will retire the debt in 15 years. Public Works is <br />funding the project at a three percent interest rate. The selected process <br />minimizes costs to other County elected offices (auditor and treasurer). Final <br />costs are currently being developed and will be presented during the notice of <br />intent to formulate study session with the Board of County Commissioners. <br />Page 2 of 8 <br />PUBLIC WORKS BOARD OF COUNTY COMMISSIONERS WORK SESSION STAFF REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.