My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-06-27-minutes-public-works-study-session
>
Meetings
>
2016
>
10. October
>
2016-10-04 10:00 AM - Commissioners' Agenda
>
2016-06-27-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 1:30:52 PM
Creation date
5/12/2020 1:30:25 PM
Metadata
Fields
Template:
Meeting
Date
10/4/2016
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
32188
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
includes site issues which may prevent over -the -road equipment from accessing the site. <br />Steerable dollies are not used in the cost provided by the Bridge Manufacturer. <br />Determining the length of bridge section which can be delivered is the responsibility of <br />the Contractor, and shall be communicated to the Bridge Manufacturer prior to the bid <br />date. <br />11.2 Installation & Lifting Procedures <br />The Bridge Manufacturer will provide a standard typical written procedures for lifting and <br />splicing the bridge. All actual methods, equipment and sequence of erection used are the <br />responsibility of the Contractor. Each section shall be lifted from the four lifting lugs <br />provided. Attach rigging to lifting lugs with adequately sized rigging hardware. Rigging <br />materials and methods are the responsibility of the Installer. Capacity of the lifting lug is <br />24,000 pounds at a 45 -degree lift angle. <br />11.3 Loose Items <br />Post and Rails will be shipped loose for field installation. <br />Bearing Plate will be shipped loose for field welding to the bottom flange of the stringers. <br />Precast Concrete Sills, Sheet Pile Back Wall, and Anchor Plates will be shipped loose for <br />field installation <br />Field welding shall be performed by others, using an AWS Certified Welder <br />12.0 WARRANTY <br />The Bridge Manufacturer shall warrant their steel structure to be free of design, material, and <br />workmanship defects for a period of ten years from the earlier of the date of delivery or from 60 <br />days after final fabrication. Wood is excluded under this warranty. This warranty shall not cover <br />defects in the bridge caused by abuse, misuse, overloading, accident, improper maintenance, <br />alteration, or any other cause not the result of defective materials or workmanship. This warranty <br />shall be void unless Owner's records can be supplied which shall indicated compliance with the <br />minimum guidelines specified in the inspection and maintenance procedures. Paint, galvanizing <br />and other special coatings shall be warranted by the coating manufacturer and is not covered by <br />the Bridge Manufacturer. Repair or replacement shall be the exclusive remedy for defects under <br />this warranty. The Bridge Manufacturer shall not be liable for any consequential or incidental <br />damages for breach of any express or implied warranty on their structures. Use of de-icing or <br />dust prohibitive chemicals or salts to any part of the bridge structure will void this warranty. <br />
The URL can be used to link to this page
Your browser does not support the video tag.