My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-03-14-minutes-public-works-study-session
>
Meetings
>
2016
>
10. October
>
2016-10-04 10:00 AM - Commissioners' Agenda
>
2016-03-14-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 1:33:16 PM
Creation date
5/12/2020 1:30:22 PM
Metadata
Fields
Template:
Meeting
Date
10/4/2016
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
32188
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />va/Design E —L f <br />L'. <br />w.��ri�.�rr�..�r � o �-.�.-r�:.�..� ��w�ri �s.s�r� �� r.� .,�wrr_.�.�r+�-.u..�....r�a.. �.�.R�,uw►��-i s-.rr. <br />The purpose of this Exhibit is to establish a procedure to determine if a consultant's alleged design error is of a <br />nature that exceeds the accepted standard of care. In addition, it will establish a uniform method forthe resolution <br />and/or cost recovery procedures in those instances wheie the agency believes it has suffered some material damage <br />due to the alleged error by the consultant. <br />Step 1 Potential Consultant Design Error(s) is Identified by Agency's Project Manager <br />At the first indication of potential consultant design error(s), the first step in the process is for the Agency's <br />project manager to notify the Director of Public Works or Agency Engineer regarding the potential design <br />error(s). For federally funded projects, the Region Local Programs Engineer should be informed and <br />involved in these procedures. (Note: The Director of Public Works or Agency Engineer may appoint an <br />agency staff person other than the project manager, who has not been as directly involved in the project, <br />to be responsible for the remaining steps in these procedures_) <br />Step Z Project Manager Documents the Alleged Consultant Dem Error(s) <br />After discussion of the alleged design error(s) and the magnitude of the alleged error(s), and with the <br />Director of Puhlic Works or Agency Engineer's coneurrened, the project manager obtains more detailed <br />documentation than is normally required on the project. Examples include: all decisions and descriptions <br />of work; photographs, records of labor, materials and equipment. <br />Step 3 Contact the Consultant Regarding the Alleged Design Error(s) <br />If it is determined that there is a need to proceed further, the next step in the process is for the project <br />manager to contact the consultant regarding the alleged design error(s) and the magnitude of the alleged <br />error(s). The project manager and other appropriate agency staff should represent the agency and the <br />consultant should be represented by their project manger and any personnel (including sub -consultants) <br />deemed appropriate for the alleged design error(s) issue. <br />Step 4 Attempt to Resolve Alleged Design Error with Consultant <br />Atter the meeting(s) with the consultant have been completed regarding the consultant's alleged design <br />error(s), there are three possible scenarios: <br />• It is determined via mutual agreement that there is not a consultant design error(s). If this is the case, <br />then the process will not proceed beyond this point. <br />It is determined via mutual agreement that a consultant design error(s) occurred If this is the case, <br />then the Director of Public Works or Agency Engineer, or their representatives, negotiate a settlement <br />with the consultant. The settlement would be paid to the agency or the amount would be reduced from <br />the consultant's agreement with the agency for the services on the project in which the design error <br />took place. The agency is to provide LP, through the Region Local Programs Engineer, a summary <br />of the settlement for review and to make adjustments, if any, as to how the settlement affects federal <br />reimbursements. No further action is required. <br />• There is not a mutual agreement regarding the alleged consultant design error(s). The consultant may <br />request that the alleged design error(s) issue be forwarded to the Director of Public Works or Agency <br />Engineer for review. If the Director of Public Works or Agency Engineer, after review with their legal <br />counsel, isnot able to reach mutual agreement with the consultant, proceed to Step 5. <br />Agreement Number. <br />WSDOT Form 140-089 FF Exhibit 1 <br />Gage 'l <br />
The URL can be used to link to this page
Your browser does not support the video tag.