My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-05-10-minutes-solid-waste
>
Meetings
>
2016
>
06. June
>
2016-06-07 10:00 AM - Commissioners' Agenda
>
2016-05-10-minutes-solid-waste
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 1:30:05 PM
Creation date
5/12/2020 1:29:28 PM
Metadata
Fields
Template:
Meeting
Date
6/7/2016
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
29894
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 28, 2016 <br />Architects Rasmussen Triebelhorn, AIA/ps <br />9 St. Helens Ave, Suite D <br />Tacoma, WA 98402 <br />Attention: Kenn Triebelhorn <br />Regarding: Kittitas County Courthouse Expansion <br />Fee Proposal - Predesign Engineering Services <br />Regarding: (1) Email RFP from ART dated 04/19/2016 <br />Dear Kenn, <br />We are pleased to provide this proposal for engineering services for the "Phase 2" <br />predesign of the referenced project. We will provide electrical, telecommunications <br />and electronic security engineering services in accordance with reference (1) and the <br />following. <br />Proposed Scope of Services <br />The scope of work includes predesign and planning services for the proposed new <br />170,000 square foot courthouse and administration building in Ellensburg, Washington: <br />Our services include the following related to electrical, telecommunications and <br />electronic security systems: <br />• Review and coordinate building programmatic requirements <br />• Prepare and coordinate conceptual design considerations <br />• Assist ART in planning for a new courthouse, including up to two development <br />concept options <br />• Prepare conceptual design narrative <br />• Prepare conceptual cost opinion <br />Our deliverables will include (1) system narrative for preliminary planning, (2) input to <br />planning documentation for new courthouse and (3) ROM cost opinions. <br />H A R G I S <br />1201 third avenue <br />suite 600 <br />Seattle, wa 98101 <br />0 <br />106.448 3375 <br />! 206.448 =450 <br />iw h.,g" hn <br />a;<< n.cn_r• r�-vCd{{oeiy5 ;��,�Ek�}pl.r ENGINEERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.