My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-05-10-minutes-solid-waste
>
Meetings
>
2016
>
06. June
>
2016-06-07 10:00 AM - Commissioners' Agenda
>
2016-05-10-minutes-solid-waste
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 1:30:05 PM
Creation date
5/12/2020 1:29:28 PM
Metadata
Fields
Template:
Meeting
Date
6/7/2016
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
29894
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 26, 2016 <br />Kenn Triebelhorn <br />Architects Rasmussen Triebelhorn <br />Tacoma, WA. <br />Icdt@a-rt.org <br />Kenn, <br />The following is our proposal for pre -design for the Kittitas County Courthouse Expansion. Our scope of <br />services will include review of the proposed design with respect to structural systems, assist cost <br />estimator in establishing structural cost and providing a design narrative to further describe the <br />structural scope of work for the project. <br />Our scope of services is based on being provided construction drawings of the existing building, at least <br />the portions that are affected. by the expansion project. It includes one or two design meetings. It does <br />not include visiting the site or additional meetings at the site. <br />Based on the above scope of services we propose a not -to -exceed fee of $2,500 -to complete the pre - <br />design phase of the project. <br />Let me know if you have any questions. <br />Thanks <br />Jim, <br />6,42raCrrr¢'50 flpa�s <br />Structural Solutions <br />James Collins, S.E., Executive Vice President <br />tacoma 253.383.2797 <br />Seattle 206.292.5076 <br />JColhns(a pcs-structural.com <br />www. )cs-structuraI.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.