My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-01-28-minutes-public-works-study-session
>
Meetings
>
2019
>
05. May
>
2019-05-07 10:00 AM - Commissioners' Agenda
>
2019-01-28-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 12:53:09 PM
Creation date
5/12/2020 12:50:20 PM
Metadata
Fields
Template:
Meeting
Date
5/7/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
53395
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
%shl g?on State <br />Depafta enc of T lransperr+t on <br />Agteernent No. I JE5593o be fiille, i h WSDOT Program Manager) <br />Task No. Amendment No. _.. Work Order No. <br />Various local ons re-.:uirin. Concrete footin- re <br />Other (ifrt higaiway) is ft" s 61;6ty . __ _ _ _ . <br />#617152-ob (North Soh. -anon Rd over Gravity Ditch) <br />#60222-016 (South Bohannon Rd over Gravity Ditch) <br />if W92-ob (WPA Rd over Turbine Ditch) <br />#87244_ob (S Thor._ Hvey ouorWestside Dltchj _ <br />PM Rl3WFO1_E_275 rNW10P <br />KP. Location <br />;sirs Kinifts Cour, <br />Task Order <br />STATE Program Manager <br />i Jim Henderson henderi wsdnt.wa, ov <br />plorm No. <br />509-377-1960 <br />Mei ing Mress <br />Fax No, <br />2809 Rudkin Road <br />Union Gaps WA 98903-1648 w ..__.... � ...^......,.....� <br />509.577.1959. <br />ttitaCounty Project Manager� <br />Mark Coo! , Public Works DirectorCoun,ty Engineer <br />509-962-7323 <br />Mttrlt.ca .kittilas.wa.us <br />M&tettlg Address <br />Fax No. <br />411 Notch Ruby Street, Suite 1 <br />509-962.7663 <br />Ellensburg, WA 913926 <br />Scope of Task Order <br />Provide brief dwaetipthon orworlr to be performed and reference attachments to include proposed work schedules, a d.tailad East estimate, <br />and any tuiditional termslconditians. <br />Repairs; <br />At various kKWIons outlined above: WSDOT will provide expertiselsuppar0mining for work to repair corsarete sill erasion, Consisting <br />of farmir:$Jgraut work at the abuttncct. <br />WSDCYf will provide onsite personnel to direc4 assist, support and training for County personnel. Alo4g with <br />eyuiptncntltoollmaterial requimnmts. <br />WSDOT will follow accepters Best Management Practices when working in enviramnen'ially seruitive areas. <br />Thr Agency is responsible for waste materials resulting from the res and will clean-up the removed waste material. <br />The Agency wig protide lebor, equipmea% tools and materials for the project. <br />The Agency is respoasible for any eaviroarnentailother required permitting and will permit the work accordingly. <br />I ltc Agency wits provide all necessary public notification 8t traft ew.trol for the repalm. <br />WSDOT personnel support and gaining duradon is I week (4 woeWays), duration may be extended if needed. <br />I�2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.