My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-04-09-minutes-solid-waste
>
Meetings
>
2019
>
05. May
>
2019-05-07 10:00 AM - Commissioners' Agenda
>
2019-04-09-minutes-solid-waste
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 12:53:02 PM
Creation date
5/12/2020 12:50:11 PM
Metadata
Fields
Template:
Meeting
Date
5/7/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
53395
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BELSAAS <br />& PO BOX 926 <br />SMITH ELLENSBURG, WA 98926 <br />509-925-9747, FAX 509-962-3031 <br />�CO]30H <br />CHANGE ORDER COST BREAK -DOWN <br />OWNER: Kittitas County DATE OF PROPOSAL: 03/14/19 <br />PROJECT: Bloom Pavilion Upgrades CHANGE ORDER PROPOSAL #: 2111 <br />DATE WORK PERFORMED: ASAP <br />LOCATION: Louver Structural Supports <br />DESCRIPTION: Complete the installation per change order proposal request 2111 to use plate washers to move the louver <br />structural supports off of the wall by 1" to accommodate the existing electrical to be left in place. Excludes tax and any work not <br />described herein. <br />Qt <br />X <br />ITEMI NAME <br />TRADE <br />I QTY I HRS I RATE I TOTAL <br />1 Josh Bacchus <br />Carpenter <br />1 8 $ 70.00 $ 560.00 <br />2 Bryan Schnase <br />Carpenter <br />1 8 $ 70.00 $ 560.00 <br />3 <br />5 <br />$ <br />4 <br />$ - <br />5 <br />$ <br />Sun -Dotal: > i,izu.uu <br />12% OH & Profit: $ 134.40 <br />TOTAL LABOR: $ 1,254.40 <br />ITEM DESCRIPTION <br />YEAR MODEL SIZE HRS RATE TOTAL <br />1 <br />$ <br />2 <br />$ <br />3 <br />$ - <br />4 <br />$ <br />5 <br />$ - <br />Sub -Total: 5 <br />12% OH & Profit: $ <br />TOTAL EQUIPMENT: $ <br />ITEM I DESCRIPTION I VENDOR <br />I UNIT I QTY I UNIT COST I TOTAL <br />1 3"x 3"x 1/4" Plate Washers (50/Box) lKnudsons <br />I Box 1 8 $ 48.50 1 $ 388.00 <br />2 <br />$ - <br />3 <br />$ - <br />4 <br />$ <br />Sun T otaT :566M <br />8.0% WSS Tax $ <br />12% OH & Profit: $ - <br />TOTAL MATERIALS: $ 388.00 <br />ITEMI COMPANY NAME I DESCRIPTION OF WORK FA REF SHEET # TOTAL <br />1 <br />2 <br />3 <br />auD- T otaT: > - <br />12% OH & Profit: $ - <br />TOTALSUBCONTRACTORS: $ - <br />COMBINED TOTAL: $ 1,642.40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.