Laserfiche WebLink
SECTION H. STORMWATER <br />1. Do you have coverage under the Washington State Industrial Stormwater ❑ YES ® NO <br />NPDES General permit? <br />If yes, please list the permit number here. <br />If no, have you applied for coverage under the Washington State Industrial ❑ YES ® NO <br />Stormwater NPDES general permit? <br />Note: If you answered "no" to both questions above, complete the following questions 2 through 8. <br />2. Describe the size of the stormwater collection area. <br />a. Unpaved area 27.769,800 sq.ft. <br />b. Paved area 105,600 sq.ft. <br />C. Other collection areas (roofs) 2300 <br />sq.ft. <br />3. Does your facility's stormwater discharge to: (Check all that apply) <br />❑ Storm sewer system; name of storm sewer system (operator): <br />❑ ❑ Sanitary sewer <br />❑ Directly to surface waters of Washington State (e.g., river, lake, creek, estuary, ocean). <br />Specify waterbody name <br />® Indirectly to surface waters of Washington State (i.e., flows over adjacent properties first). <br />❑ Directly to ground waters of Washington State via: <br />❑ ❑ Dry well <br />❑ Drainfield <br />❑ Other <br />4. Areas with industrial activities at facility: (check all that apply) <br />❑ ❑ Manufacturing building <br />F-111 Material handling <br />❑ ❑ Material storage <br />F-111 Hazardous waste treatment, storage, or disposal (refers to RCRA, Subtitle C facilities only) <br />®❑ Waste treatment, storage, or disposal <br />❑ ❑ Application or disposal of wastewaters <br />❑ ❑ Storage and maintenance of material handling equipment <br />❑ ❑ Vehicle maintenance <br />❑ ❑ Areas where significant materials remain <br />F-10 Access roads and rail lines for shipping and receiving <br />ECY-040-179 (rev. 08/2012) Page 19 of 21 <br />