My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-06-10-minutes-public-works-study-session
>
Meetings
>
2019
>
06. June
>
2019-06-18 10:00 AM - Commissioners' Agenda
>
2019-06-10-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 12:40:47 PM
Creation date
5/12/2020 12:36:06 PM
Metadata
Fields
Template:
Meeting
Date
6/18/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
54424
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
June 6. 2019 1 KPFF Consulting Engineers KPFF <br />BIG BOULDER CREEK BRIDGE <br />REPLACEMENT <br />Principal Project <br />Manager <br />Technical <br />Specialist <br />Structural <br />Task Lead <br />Project <br />Engineer <br />CAD <br />Technician <br />ect <br />Cinator <br />L$706,24 <br />Item <br />SCOPE OF WORK <br />$171.52 $119.66 <br />$171.52 <br />$119.88 <br />$114.34 <br />$121,sfi <br />1 <br />PROJECT MANAGEMENT <br />1.10 <br />Project Team Management and Coordination <br />60 <br />$7,184 <br />1.20 <br />Monthly Progress Reports/invoices <br />6 <br />12 <br />$1-872 <br />1.30 <br />Monthly Project Progress Meetings/Minutes <br />16 <br />6 <br />$2,372 <br />1.40 <br />Coordination with WD <br />a <br />$957 <br />1.60 <br />-FW <br />Team Coord navon for aecign v^ang5 <br />6 <br />$957 <br />Labor Subtotal: <br />— - - .. - <br />100 <br />is- <br />$12,383 <br />$119.90 <br />$15,673.00 <br />2 <br />STRUCTURAL ENGINEERING <br />2.10 <br />Project Kickoff Meeting and Site Visit <br />6 <br />6 <br />$1.436 <br />2.20 <br />Alternative Analysis Memo <br />2 <br />16 <br />$2.258 <br />2.30 <br />Development of PS&ElContract Bid <br />Documents <br />2.31 <br />Plan and Calculation Preparation <br />Cover Sheet <br />2 <br />2 <br />6 <br />$1,198 <br />General Notes, Quantities, <br />2 <br />4 <br />4 <br />20 <br />$3.712 <br />3712Bridge <br />BridgeLayout - plan and elevation <br />4 <br />20 <br />8 <br />20 <br />$6.428 <br />Foundation Plan - Layout <br />2 <br />4 <br />16 <br />20 <br />$5084 _ <br />Footing Details <br />2 <br />4 <br />16 <br />20 <br />$5084 <br />Wingwall Layout/ Details <br />2 <br />4 <br />16 <br />20 <br />$5084 <br />Temporary/Detour Bridge Layout <br />2 <br />4 <br />16 <br />20 <br />$5084 <br />2.32 <br />Structural Special Provisions <br />4 <br />16 <br />B <br />$3.516 <br />2.33 <br />Cost Estimate <br />2 <br />4 <br />a <br />_ $1 736_ <br />2.34 <br />Deliverable Preparation (30%, 75%, 100% 2 <br />hr. each) <br />6 <br />6 <br />6 <br />2 <br />$2287 <br />2.40 <br />Quality Control Checks and Reviews <br />8 6 <br />6 <br />20 <br />4 <br />4 <br />$6.457 Y <br />2.50 <br />Technical Collaboration (Survey, Civil, <br />Geotechnical, Hydraulics, Environmental) <br />6 <br />16 <br />B <br />6 <br />$4832 <br />2.60 <br />Construction Support (RFI's, Submittals, etc.) <br />as needed <br />6 <br />8 <br />$1872 <br />2.70 <br />Feasibility Review for 60' span bridge <br />B <br />2 <br />$1 186 <br />2.71 <br />Review of temporary bridge details for 1 year <br />in service <br />4 <br />2 <br />$707 <br />— <br />2 EO <br />Revise contract documents to remove <br />rmanent bridge work <br />2 2 <br />8 <br />2 <br />8 <br />$2742 <br />Labor Subtotal: <br />10 14 <br />34 <br />154 <br />126 <br />152 J <br />2 <br />$60,705 <br />$0.00 <br />GEOTECHNICAL ENGINEERING <br />0 <br />4 <br />Labor Subtotal: <br />HYDRAULIC ENGINEERING <br />0 0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />$0 <br />Labor Subtotal: <br />0 0 <br />0 <br />0 <br />0 <br />1 0 <br />1 0 H <br />$o <br />$0.00 <br />5 <br />ENVIRONMENTAL DOCUMENTATION & <br />PERMITTING <br />Labor Subtotal: <br />-- <br />M—AMORM0 <br />0 0 <br />0 <br />0 <br />0 <br />0 <br />0 <br />$0 <br />$0.00 <br />6 <br />CIVIL ENGINEERING <br />6.10 <br />Project Management <br />2 <br />4 <br />$2752 <br />6.20 <br />PS&E Bid Docs <br />Site Preparation Plan (901`100/100 Ad) <br />2 <br />14 <br />$4.079 <br />Roadway plan and profile (3019 011 0011 0 0 Ad) <br />2 <br />20 <br />$5.590 <br />Typical Sections and Details (901100/100 Ad) <br />2 <br />12 <br />$3.250 <br />Detour plan, profile & typical section <br />(30/9011001100 Ad) <br />4 <br />24 <br />$6,500 <br />Full closure signage plan <br />2 <br />12 <br />$3.250 <br />Civil Stream grading for bypass and/or <br />jk!Arnents (no drawings) <br />2 <br />$2671 <br />iqm Page 1 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.