Laserfiche WebLink
KITl X'3rJL 3 CO <br />DEPARTMENT OF PUBLIC WORKS <br />The load rating will take into account the existing condition using the most recent bridge inspection <br />report. This report will be used to determine the depth of overlay, impact factor and condition factor of <br />the rated members. <br />Bridge records for 89342 do not contain any design drawings, only field sketches of girders/stringers. <br />Dimensions will be confirmed in conjunction with the routine bridge inspections. Time to take field <br />measurements and documentation is included under this work order. <br />A signed Load Rating Summary sheet will be provided for each bridge along with a brief memo that will <br />include the most recent inspection report, analysis assumptions, design drawings and calculations. <br />In addition: <br />• Load rating limited to bridge superstructure (girders slab and crossbeam, if applicable). Jf <br />substructure has reduced capacity and requires rating; additional fee will be required. <br />• Assume all updates to WSBIS will be completed by KPFF <br />• Load Rating reports and summary sheets will be uploaded to the project FTP site. The County wit <br />update their bridge files with the reports. <br />O County to determine if any bridges require posting for Emergency Vehicles if rating factors are <br />less than 1.0. <br />Cost Breakdown: See attached. f <br />Agency Signature: Date: <br />Consultant Signature: A&00000 <br />Date: <br />SlaT <br />