Laserfiche WebLink
CITY OF CL15 SLUM <br />Miller Avenue & SR 908 Sewer Extension <br />8!5/2019 <br />Engineers Opinion of Construction Cost <br />HLA Project Na 18101 E <br />Description <br />S tiPayment <br />Unit <br />URN Coat Quoverall <br />ty <br />Overall Cost <br />1norC . e <br />1-04.4(j) <br />FA$S,OOD.OD <br />1 <br />55,OD0.0D <br />z Wil¢ation' <br />1-06.7 <br />LS <br />$i,500.00. <br />1 <br />51.500.66, <br />3 p TeniporeryTrafcontrol <br />1-10.5 <br />LS <br />$5=100 <br />1 <br />951000.00 <br />4 Crushed Surfacing t385e Course <br />4-D4.5 <br />TON <br />$45.DD <br />85 <br />$3,825.00 <br />5 Crushed Suriecing Top Course <br />4-04,5 <br />TON <br />$45.00 <br />30 <br />$1,350,00 : <br />6 HMA Ci. 1/2 -inch PG 64-26 <br />5.04.5 <br />TDN <br />$14QOD <br />50. <br />—57,000,00 <br />7 Manhole 48 In_ Diem, Type 1 <br />7-05 5 <br />EA <br />S3,8DO.OQ <br />1 <br />$a,e00.OQ: <br />8 Shoring or ExUa 5=vwation <br />7-08.5 <br />LF <br />$4.00 <br />145 <br />S5130.00. <br />e Select $ackf ll, as Directed <br />7-08.5 <br />CY <br />540.00 <br />20 <br />$800,06 <br />j1DJ PVC Sanitary Saw Pipe 12 In. Diem. <br />-17.5 <br />LF--- <br />$10-66 <br />14 <br />$101350.06 <br />Subtotal <br />$3$,005.00 <br />Sales Tax 8.0% <br />$3,126.40 <br />Contingency 10% <br />$4,200.00 <br />Total EstimxWd Constructlon Cost <br />$48,325.40 <br />Construction Eng(neering 15% <br />$6,650.00 <br />Total Eellmabd Project Coat <br />$53,278.40 <br />G:1PROJSCTS12018118101FOrigineees Esilmetes -Water d Sewer ImprovernentM89wer Construction Cost Estimate - Now Avenue 8 SR 003.xkx <br />