My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-06-10-minutes-public-works-study-session
>
Meetings
>
2019
>
06. June
>
2019-06-18 10:00 AM - Commissioners' Agenda
>
2019-06-10-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 12:40:47 PM
Creation date
5/12/2020 12:36:06 PM
Metadata
Fields
Template:
Meeting
Date
6/18/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
54424
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W�G,oes ... zn Ty�,co <br />44��� � `Ley KZTTZTAE3 CO <br />- DEPARTMENT OF PUBLIC WORKS <br />IarrrTAS COUNTY <br />3. New bridge is assumed to be designed for one 12 foot lane, and two 2 foot shoulders <br />and no sidewalks. <br />4. Bridge superstructure will have a 2% crown from the centerline of the roadway, or as <br />prescribed by COUNTY Civil roadway design. <br />5. There will be no drains on the bridge. <br />6. Bridge superstructure is assumed to be prefabricated and designed and supplied by <br />the Contractor during construction. <br />7. Load rating report will be provided by bridge superstructure supplier. <br />S. COUNTY will prepare Division 1 and assemble special provision package and bid <br />package. <br />Cost Breakdown: See Attached <br />Project Schedule: KPFF will provide a PDF of the plans for the 30%, 75%, and 100% design at <br />the dates shown below. For efficiency, the design will continue following milestone submittal <br />while the county performs review of the submitted plans. The COUNTY will endeavor to <br />complete and return to KPFF all comments as soon as possible following receipt of them, but in <br />no case more than 10 business days following the submittal date. <br />Milestone <br />Milestone <br />Description — Structural <br />Description — Civil <br />Delivery <br />Date <br />30% <br />November <br />Permit set. 3 sheets estimated. <br />Permit set. Roadway plan <br />2018 <br />Layout, Elevation, Cross- <br />and profile and detour <br />section, basic notes <br />plan and profile. Typical <br />sections. <br />75% <br />January 2019 <br />6-8 sheets, all items including <br />5-7 sheets, all items <br />further development of the <br />including further <br />notes, specs, and quantities. <br />development of the notes, <br />specs, and quantities. <br />100 % Draft <br />March 2019 <br />6-8 sheets, all items developed <br />5-7 sheets, all items <br />and ready for construction, <br />developed and ready for <br />pending final review by County. <br />construction, pending <br />Complete PS&E. <br />final review by County. <br />Complete PS&E. <br />100% Stamped <br />April 2019 <br />Stamped and Signed Contract <br />Stamped and Signed <br />and Signed <br />f <br />Documents — bid ready. <br />Contract Documents — bid <br />ready. <br />Addendum I <br />June 2019 <br />Prepare amendments <br />Prepare amendments <br />
The URL can be used to link to this page
Your browser does not support the video tag.