Laserfiche WebLink
�GpSCADES... Tp 1HECD �rT T►q J��'V ��1 T�T/��� <br />`PD�� CG'65 L�i�11 Aim `I® V 1� 1 Z <br />DEPARTMENT OF PUBLIC WORKS <br />KI'I"I't'1'AS COUMfY <br />Task 09 — Construction Support <br />No changes to the original Task Order. <br />TASK ORDER AMENDMENT ASSUMPTIONS: <br />1. None provided. <br />AMENDED COST ESTIMATE: <br />Total - $294,373 amended as shown in the following table: <br />Amended Cost and Hours Summan, <br />Additional <br />Hours <br />Task Name <br />Jacobs <br />Task 01 — Project Management <br />Task 02 — Agency Coordination <br />15 <br />Task 03 — Geotechnical Analysis and <br />Reporting <br />Task 04 — Hydraulic Analysis and <br />Re ortin <br />220 <br />Task 05 — Environmental Documentation <br />and Permitting <br />50 <br />Task 06 — Structural Engineering <br />Task 07 — Right -of -Way <br />Task 08 — Civil Plans MOT Assistance <br />220 <br />Task 09 — Construction Support <br />Previous Task Order Hours <br />1 349 <br />AMENDED TASK ORDER HOURS <br />1854 <br />Previous Task Order Cost <br />$243 173 <br />AMENDED TASK ORDER COST <br />$294,373 <br />Project Schedule: <br />• Advertisement: 6/27/19 <br />• Task Order Completion: 12/31/19 <br />Agency Signature: <br />Date: <br />Consultant Signature: �.>,l� � ,,%" Date: �( � <br />S <br />