My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-06-24-minutes-public-works-study-session
>
Meetings
>
2019
>
07. July
>
2019-07-02 10:00 AM - Commissioners' Agenda
>
2019-06-24-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 12:34:20 PM
Creation date
5/12/2020 12:33:28 PM
Metadata
Fields
Template:
Meeting
Date
7/2/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
54866
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U,SClnE _.10% <br />Heck`-X=XTzkiSi COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />KITT%TAS COUNTY <br />b. 100% Draft and Final Plans (8 sheets) <br />Task 05 - Environmental Documentation and Permitting <br />Task 05 is amended as follows: <br />The addition of the landowner access bridge requires a JARPA amendment package for WDFW. <br />Jacobs will amend the JARPA and coordinate with WDFW for acquisition of the HPA. <br />1. Deliverables: <br />a. JARPA package amendment, with maps and plans, in support of the HPA. <br />Task 06 - Structural Engineering <br />No changes to the previous Task Order. <br />Task 07 - Right of Way <br />No changes to the original Task Order. <br />Task 08 - Civil, Plans, and MOT Assistance <br />Task 08 is amended as follows: <br />1. Roadway Design Services <br />a. Remove landowner access road from design file and plans. <br />b. Develop full designs for new landowner access bridge. Coordinate with COUNTY and <br />subconsultant team to incorporate changed Right of Way, and Hydraulic design elements <br />into the new Project Design File. <br />c. Revise existing and proposed geometrics, design elements, design variances, design <br />decisions, drainage design, based on the new project design. <br />d. Update Project Design File. <br />e. Incorporate irrigation infrastructure into the roadway plan set and specials. <br />f. Revise PS&E to include multiple design changes. <br />g. Updated construction cost for advertisement. <br />2. Deliverables: <br />a. Draft and Final Basis of Design Memo <br />b. 30% Plan Set <br />c. 60% Progress set of Plans, Specifications, and Estimate <br />d. 90% Design Plans (11x17 PDF and CAD files) <br />e. Special Provisions for Roadway Elements <br />f Compiled 90% PS&E Set <br />g. 100% Design Plans (11x17 PDF and CAD files) <br />h. Compiled 100% PS&E Set for Roadway <br />i. Compiled plan set for COUNTY forces work. <br />j. List of Bid Items and Quantities with backup calculations <br />k. Probable construction cost for advertisement <br />
The URL can be used to link to this page
Your browser does not support the video tag.