Laserfiche WebLink
INDUSTRIAL,INC.M2INDUSTRIAL,INC.180HansonRoadEllensburg,WA98926509-925-6303Cont.Reg.#MTWOII*088DQoffice@m2industrial.comCHAINLINKFENCESPECIFICATIONFABRIC:72"9GA.PRIVALINK.TOPRAIL:15/8"O.D.LG40PIPE,1.83lbs.perfoot.Toprail21'inlength,joinedwith15/8"SLEEVE.LINEPOST:27/8"O.D.LG40PIPEPOST,4.67lbs.perfoot.Linepostsset10'oncentermaximumspacing.Concretefooting:12"diameter,36"depth.TERMINALPOST:4"O.D.LG40PIPEPOST,5.83lbs.perfoot.Concretefooting:16"diameter,36"depth.BRACING:Terminalpostsbracedandtrussedtothenearestlinepostwith15/8"O.D.LG40PIPEand3/8"TRUSSROD&TRUSSRODTIGHTENER.TENSIONWIRE:7GA.COILSPRINGCLASS4TENSIONWIREattachedtobottomoffencefabricwith9GA.ALUMINUMHOGRINGspaced24"oncenter.FITTINGS:REGULARBRACEBAND&CARRIAGEBOLT,PRESSEDSTEELRAIL-END,PRESSEDSTEELEYE-TOP,PRESSEDSTEELCAP,3/16"X3/4"TENSIONBAR,REGULARTENSIONBAND&CARRIAGEBOLT.TIEWIRE:101/4"9GA.ALUMINUMTIEWIRE&61/2"9GA.ALUMINUMTIEWIREspaced15"oncenterforlineposts&24"oncenterforrails.POSTFOOTING:READYMIXCONCRETE.