My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-08-12-minutes-public-works-study-session
>
Meetings
>
2019
>
08. August
>
2019-08-20 10:00 AM - Commissioners' Agenda
>
2019-08-12-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 11:09:18 AM
Creation date
5/12/2020 11:08:52 AM
Metadata
Fields
Template:
Meeting
Date
8/20/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
55882
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KITTITAS COUNTY <br />DEPARTMENT OF PUBLIC WORKS <br />PUBLIC WORKS — BOARD OF COUNTY COMMISSIONERS <br />STUDY SESSION STAFF REPORT <br />STUDY SESSION DATE: August 12, 2019 <br />TOPIC: ELN Taxi -lane Construction <br />ACTION REQUESTED: Direct Staff <br />LEAD STAFF: <br />Mark R. Cook <br />RECOMMENDATION: <br />Direct staff prepare cost estimates for extending utilities and constructing two taxi -lanes <br />at ELN supporting pending private hangar leases. <br />BRIEFING SUMMARY: <br />• Five (5) pending lessees require new taxi -lanes to access ELN parcels <br />• Utilities (sewer, water, electric and gas) should be extended prior to taxi -lane <br />construction <br />• The Airport Fund (10 1) does not have sufficient cash reserves likely needed for <br />taxi -lane construction <br />• Economic development plan for ELN is likely one year away from delivery <br />BACKGROUND: <br />Five (5) private pilots have put deposits down for leasing lots inside the fence at ELN for <br />building private hangars. The location of the lots requires the construction of two <br />separate taxi -lanes extending from the existing apron area to back lots located along <br />Bowers Road. <br />DISCUSSION: <br />Taxi -lane construction is envisioned in the current ELN Master plan. The cost of utility <br />extension is likely the most expensive part of the taxi -lanes. The Board must consider the <br />impact of seeking total cost recovery for project costs against the lots benefited or <br />recognize the cost of development is incidental to leasing up available rental area airside <br />at the airport. <br />Supplemental funding is required for the taxi -lane to go forward in design and <br />construction is 2020. Once an engineering and planning consultant is selected for ELN, <br />the design and construction oversight tasks can be undertaken. <br />Page 1 of 3 <br />PUBLIC WORKS BOARD OF COUNTY CONINUSSIONERS WORK SESSION STAFF REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.