Laserfiche WebLink
�CP�pL+rs...'fo 7NFC <br />DEPARTMENT OF PUBLIC WORKS <br />INICI=AS .N•Y <br />ROW/property lines and other items which are reasonably likely to impact the bridge <br />layout and design. <br />2. KPFF to provide specifications related to the PS&E they develop (bridge portion <br />only). <br />3. New bridge is assumed to be designed for one 12 foot lane, and two 2 foot shoulders <br />and no sidewalks. <br />4. Bridge superstructure will have a 2% crown from the centerline of the roadway, or as <br />prescribed by COUNTY Civil roadway design. <br />5. There will be no drains on the bridge. <br />6. Bridge superstructure is assumed to be prefabricated and designed and supplied by <br />the Contractor during construction. <br />7. Load rating report will be provided by bridge superstructure supplier. <br />8. COUNTY will prepare Division 1 and assemble special provision package and bid <br />package. <br />9. COUNTY will acquire 60ft prefabricated bridge superstructure separately from this <br />Contract. <br />Cost Breakdown: See Attached <br />Project Schedule: KPFF will provide a FDF of the plans for the 30%, 75%, and 100% design at <br />the dates shown below. For efficiency, the design will continue following milestone submittal <br />while the county performs review of the submitted plans. The COUNTY will endeavor to <br />complete and return to KPFF all comments as soon as possible following receipt of them, but in <br />no case more than 10 business days following the submittal date. <br />Milestone <br />Milestone <br />Description — Structural <br />Description — Civil <br />Delivery <br />Date <br />30% <br />November <br />Permit set. 3 sheets estimated. <br />Permit set. Roadway plan <br />' 2018 <br />Layout, Elevation, Cross- <br />and profile and detour <br />section, basic notes <br />plan and profile. Typical <br />sections. <br />7S % <br />January 2019 <br />6-8 sheets, all items including <br />5-7 sheets, all items <br />further development of the <br />including further <br />notes, specs, and quantities. <br />development of the notes, <br />specs, and quantities. <br />100 % Draft March 2019 <br />6-8 sheets, all items developed <br />5-7 sheets, all items <br />and ready for construction, <br />developed and ready for <br />pending final review by County. <br />construction, pending <br />