My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-11-12-minutes-public-works-study-session
>
Meetings
>
2019
>
11. November
>
2019-11-19 10:00 AM - Commissioners' Agenda
>
2019-11-12-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 10:47:12 AM
Creation date
5/12/2020 10:44:08 AM
Metadata
Fields
Template:
Meeting
Date
11/19/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
57953
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 25, 2019 1 <br />Wekrshed Sdencea Englneedng WSE <br />61G BOULDER CREEK BRIDGE Pdndpal Strad <br />ed ` I Juni" ilWmtilskdo <br />REPLACEMENT Enpneer 1 Engineer t r <br />Item I SCOPE OF WORK <br />5212.98 5188.66 697.37 $97.93 <br />1 PROJECT MANAGEMENT <br />1.10 Project Team Management and Ca rdlnadcn <br />1.20 Monthly Progress Repwisgmrol®a <br />--- <br />1.30 Monthly Project Progress MeefingdMinutes <br />1.40 Coordination with WDFW 1 <br />1.80 Team Coordination for design change <br />1.70 Team Coordination for revised desion <br />Labor 9ubcotal: <br />e 8 a a So <br />2 STRUCTURAL ENGINEERING <br />2.10 Project NieW Meeting and Sba Moret <br />2.20 Alternative Andysis Mamo <br />230 Development of PSBFJContrad gid <br />Documents <br />2.31 Plan and Calculation PreparaJor. <br />CoverSheet <br />Genarel Nota% OuenMM <br />Bridge Layout -plan and elwation <br />Foundation Plan - Layout <br />Foiling Detaiie <br />Wingwall 1Detsiis <br />-�--- -- <br />TemporaryZeLour Bridge L.aystf <br />- - - - <br />232 S"du al Special provision <br />2.33 Cost E511mas <br />_ <br />234 Deliverable Preparatm (30%, 75%. 100%2 <br />hr. each <br />- <br />240 Quality Car" Checks and Reviews <br />Technical Collaboration (Survey, Civil, <br />250 Geotachnica% Hvdmdlm. Frvironmerle) <br />260 u ontiLIpport. r.:n:ta 4 slot <br />w needed <br />270 Feasibility Reviewfor 50' span bits <br />2.71 Review of temporary bridge deta'is for 1 year <br />;n service <br />- <br />2.80 Revise wrJrad dow:nents to remove <br />mianent bdd a work <br />_ Labor SuLtafth <br />4;EWMCHNICAL ENGINEERING <br />0 1 8 0 1 a is <br />3.10 <br />lRannirig and Research <br />3.20 Field Work <br />_ <br />3.21 Site Reconnaissance and Utility Locates <br />3.22 Field 6cpioretions <br />3.23 Sample Review 8 Testing <br />3.30 Office Work <br />3.31 Engineering Analysis and Consufttlws <br />3.32 Geotadmkal Reporting <br />3.33 Pmjed Management and Meelings-- <br />3.40 lConstrue6on Support <br />.. <br />3.50 IFeasMIftyRewiwftrWspsnbdclgs <br />- ._. <br />3.61 Review of temporary bridge delalk for 1 year <br />in service <br />352 Revise Geotechnical Recanmentlatars for <br />Labor Suirictal: <br />4 HYDRAULIC ENGINEERING <br />0 a o a M <br />4.10 <br />Date Cdiectorh and Review 1 <br />2 <br />8 S+ 2tl5 <br />4.20 <br />Site Inspection <br />a <br />a _.$2.4.483-. <br />- --_ <br />4.30 <br />Channel Survey <br />2 <br />4 _ _ $615 <br />4.40 <br />Hydrology <br />2 <br />4 Sats _ <br />--52.592 <br />4.50 <br />HydroulicAnelyals <br />2 1 <br />20 <br />4.30 <br />Channel Stability and scour Assaeament { <br />10 <br />4.70 <br />WDFW and Penni Coor iination <br />12- <br />_ <br />4.80 <br />Hydraulic Investigation Report <br />20 4 <br />16 59.372 <br />-_--52%14_ <br />4.90 <br />MeetingsSAdmini Moon <br />10 <br />3 2 <br />4,100 <br />Feesibitry Review far W openbdd <br />4 <br />8 1 ft,729 <br />4.f01 <br />Review of femporory bridge dela'Is for 1 year <br />. I <br />m cervi® <br />4 <br />4 41.271 <br />Optic-- <br />rwl... <br />_. .... _....----- <br />�� Page 5 of S <br />
The URL can be used to link to this page
Your browser does not support the video tag.