Laserfiche WebLink
October 25, 2019 <br />KPFF Candling &ginsers <br />KPFF <br />BIG BOULDER CREEK BRIDGE <br />Pda�oel Pmied T d- sin al p o act CAD Prd'ad <br />REPLACEMENT <br />Manager Spuciafat Tack Lead E,gineer <br />Ted nldan Coed nate <br />Kum SCOPEOFWORK <br />$171.62 $114.96 $171.62 $119.66 MU.34 <br />$121.66 $76.24 <br />6 CIVIL ENGINEERING <br />6.10 act Management <br />2 4 <br />$2,762 <br />6.20 PSSE Bid Dora <br />31e N"ration Plan (90!1001100 Ad) <br />2 <br />14 <br />$4D79 <br />Roadway plan and profRe (3019011001100 Ad) <br />2 <br />20 <br />_ <br />$6,690 <br />Typical Sedions and Details (W1001100 Ad) <br />2 <br />12 <br />$3.250 <br />Detour plan, profile 6 typloal section <br />4 <br />24 <br />58.5" <br />�306'g01100J100 Ad <br />FLOI o QWM signage Plan <br />2 <br />12 <br />$3250 <br />Cavil Stream grading for bypass an cVor <br />2 <br />12.571 <br />vino dwM <br />Stommzter Slee plan and CSPP <br />6 <br />$2,Y25 <br />Civil Special prWaians <br />2 <br />$1A00 <br />Civil Cod Estimate <br />2 <br />$1.W9 <br />6.30 OC Reviews <br />6 <br />$1629 <br />6.40 Coretnetllon Support <br />2 <br />_ <br />$1009 <br />6.50 Revise centrad documanis to remove <br />6 6 <br />6 <br />$2446 <br />nmaMFdhi a mak <br />6.60 Revise wntract documents for 6083 n <br />44 <br />30 <br />$9.710 <br />Labor Subtotal: <br />0 0 12 0 74 <br />126 9 <br />$47,619 <br />_ <br />$a= <br />Libor Sn :j <br />16 111 46 I" 2ty0 <br />Vii <br />Raleroursabla Sime:: <br />i Pegs 2 of 8 <br />