My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-11-12-minutes-public-works-study-session
>
Meetings
>
2019
>
11. November
>
2019-11-19 10:00 AM - Commissioners' Agenda
>
2019-11-12-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 10:47:12 AM
Creation date
5/12/2020 10:44:08 AM
Metadata
Fields
Template:
Meeting
Date
11/19/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
57953
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�G ,DES ... -o7NEc� <br />_ DEPARTMENT OF PUBLIC WORKS <br />[a1T[TAS COUNTY <br />• A reasonable bridge length will be agreed to that the County can afford to build. <br />TASK 4.80 — Hydraulic Design Report <br />WSE will prepare a hydraulic design report to summarize and document the results of the <br />investigation. It will include the recommended NBIS Scour Code rating for the new structure, a <br />code that the County will need for their records. <br />Assam tiA ions: <br />• A draft of the report will be provided to the County and KPFF for review. Upon receipt <br />of comments, WSE will refine the report and submit a final version as a PDF. <br />TASK 4.90 — Meetings and Administration <br />An allowance is provided for WSE personnel to attend one meeting at KPFF's Seattle office to <br />discuss the design and one meeting in Ellensburg to meet with the County. <br />Assumptions: <br />WSE will develop concept sketches of the countermeasures which will be provided to <br />KPFF. KPFF will prepare detailed plans to be incorporated into the project plan set. <br />• WSE will recommend specifications for the countermeasures. <br />• WSE has included a modest cost for this task in the accompanying cost estimate. This <br />estimate will be revisited and may need to be revised once the type and scale of <br />countermeasures required are identified. <br />• At this time it is assumed that scour and erosion protection countermeasures are not <br />necessary and have not been included in the fee <br />TASK 4.100 — Feasibility Review <br />Perform a high level review to determine if a 60 foot bridge span is feasible to eliminate need for <br />cast -in-place abutments. Evaluate design for using temporary detour bridge for 1 year rather than <br />originally anticipated 3 month duration. <br />TASK 5 ENVIRONMENTAL/PERMITTING <br />The Jacobs team will deliver Environmental Documentation and Permitting in coordination with <br />KPFF and Kittitas County staff. <br />TASK 5.10 — Project Management <br />
The URL can be used to link to this page
Your browser does not support the video tag.