Laserfiche WebLink
�c IDES ... zor c� <br />KITTrrAS COUNTY <br />ZKKXWWX ALS CO <br />DEPARTMENT OF PUBLIC WORKS <br />Wingwali Layout/Details <br />TASK 2.32 — Structural Special Provisions <br />TASK 2.33 — Cost Estimate <br />TASK 2.34 — Deliverable preparation <br />TASK 2.40 — Quality Control Checks and Reviews <br />TASK 2.50 — Technical Collaboration <br />Structural design engineers will coordinate with survey, civil, geotechnical, hydraulics and <br />environmental engineers for project design and contract coordination. <br />TASK 2.60 — Construction Support <br />If needed to provide support during construction to respond to RFI's and review submittals. <br />TASK 2.70 — Feasibility Review <br />Perform a high level review to determine if a 60 foot bridge span is feasible to eliminate need for <br />cast -in-place concrete abutments. Evaluate existing design for using temporary detour bridge for <br />1 year rather than originally anticipated 3 month duration. <br />TASK 2.80 — Revise Contract Documents <br />Update plans, specifications and estimate and issue and addendum to the contract bid documents <br />as necessary to limit 2019 construction work to installation of temporary detour road and bridge. <br />TASK 3 GEOTECHNICAL ENGINEERING <br />TASK 3.10 — Planning and Research <br />Hart Crowser will review readily available geologic maps and water well logs that cover the site <br />vicinity, and other reports and plans provided by others (if any) for general information <br />regarding subsurface soil and groundwater conditions and geologic hazards. <br />