My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-11-12-minutes-public-works-study-session
>
Meetings
>
2019
>
11. November
>
2019-11-19 10:00 AM - Commissioners' Agenda
>
2019-11-12-minutes-public-works-study-session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2020 10:47:12 AM
Creation date
5/12/2020 10:44:08 AM
Metadata
Fields
Template:
Meeting
Date
11/19/2019
Meeting title
Commissioners' Agenda
Location
Commissioners' Auditorium
Address
205 West 5th Room 109 - Ellensburg
Meeting type
Regular
Meeting document type
Supporting documentation
Supplemental fields
Alpha Order
a
Item
Approve Minutes
Order
1
Placement
Consent Agenda
Row ID
57953
Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KIT 31WALI3 CO <br />DEPARTMENT OF PUBLIC WORKS <br />Kr=A8 COUNTY <br />Formal Task Order Document <br />KPFF <br />Task Order Number 016 <br />Maximum Amount Payable $248,000 Completion Date 12/30/2019 <br />The general provisions and clauses of Local Agency Agreement Number (KCPW 2017- <br />19ENG2) shall be in full force and effect for this Task Order. <br />Location of Project: Kittitas County <br />Project Title: Big Boulder Creek Bridge Replacement <br />Description of Work: KPFF will prepare the PS&E documents for the replacement of the Big <br />Boulder Creek Bridge in coordination with Kittitas County staff. The design team includes: <br />KPFF — Project Management, Structural and Civil Engineering <br />Hart Crowser — Geotechnical Engineering <br />Watershed Science and Engineering — Hydraulic Engineering <br />Jacobs — Environmental/Permitting <br />Tentative Project Advertisement is April 2020, but will be dependent on permitting, fish <br />windows, and bridge procurement schedules. <br />The existing timber bridge is located on Cle Elum Valley Road over Big Boulder Creek <br />approximately three miles north of the Salmon La Sac Campground. The bridge is currently <br />posted for a 5 Ton weight limit due to scour at the timber sill foundation. The County prefers to <br />replace the bridge with a single lane prefabricated superstructure. <br />TASK 1 PROJECT MANAGEMENT <br />KPFF will manage the development of the PLANS, SPECS & ENGINEERING COST <br />ESTIMATE (PS&E) in such a manner to ensure the County is able to achieve the desirable <br />bidding date. This effort will include appropriate in-house duties such as invoicing, contract <br />
The URL can be used to link to this page
Your browser does not support the video tag.